Business Process Modeling of Logistic Production Systems
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F47813059%3A19520%2F16%3A00010745" target="_blank" >RIV/47813059:19520/16:00010745 - isvavai.cz</a>
Výsledek na webu
<a href="http://link.springer.com/chapter/10.1007/978-3-319-39883-9_16" target="_blank" >http://link.springer.com/chapter/10.1007/978-3-319-39883-9_16</a>
DOI - Digital Object Identifier
<a href="http://dx.doi.org/10.1007/978-3-319-39883-9_16" target="_blank" >10.1007/978-3-319-39883-9_16</a>
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Business Process Modeling of Logistic Production Systems
Popis výsledku v původním jazyce
The paper highlights the problem of the logistic system modeling which consists of similar structures representing a synthetic manufacturing plant. Routes for products as well as matrixes of life and state are given. Structures differ from each other as they have various transport times from one production stand to an-other. Additionally, tool replacement times and machine maintenance times are given. There are also dedicated buffer stores which make the manufacturing pro-cess possible even if the subsequent machine is busy. Manufacturing strategies and heuristic algorithms are responsible for the control of the system. The main criterion is to minimize the total manufacturing time by means of searching for such a sequence of operations which often leads to avoiding bottlenecks. The main goal of the paper is to build a mathematical model of the above characterized system including proposals for algorithms for optimizing production in relation to orders.
Název v anglickém jazyce
Business Process Modeling of Logistic Production Systems
Popis výsledku anglicky
The paper highlights the problem of the logistic system modeling which consists of similar structures representing a synthetic manufacturing plant. Routes for products as well as matrixes of life and state are given. Structures differ from each other as they have various transport times from one production stand to an-other. Additionally, tool replacement times and machine maintenance times are given. There are also dedicated buffer stores which make the manufacturing pro-cess possible even if the subsequent machine is busy. Manufacturing strategies and heuristic algorithms are responsible for the control of the system. The main criterion is to minimize the total manufacturing time by means of searching for such a sequence of operations which often leads to avoiding bottlenecks. The main goal of the paper is to build a mathematical model of the above characterized system including proposals for algorithms for optimizing production in relation to orders.
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
—
OECD FORD obor
10201 - Computer sciences, information science, bioinformathics (hardware development to be 2.2, social aspect to be 5.8)
Návaznosti výsledku
Projekt
—
Návaznosti
I - Institucionalni podpora na dlouhodoby koncepcni rozvoj vyzkumne organizace
Ostatní
Rok uplatnění
2016
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
AGENT AND MULTI-AGENT SYSTEMS: TECHNOLOGY AND APPLICATIONS, KES-AMSTA 2016
ISBN
978-3-319-39883-9
ISSN
—
e-ISSN
—
Počet stran výsledku
9
Strana od-do
199-207
Název nakladatele
Springer International Publishing
Místo vydání
Puerto de la Cruz, Tenerife, Spain
Místo konání akce
Puerto de la Cruz, Tenerife, Spain
Datum konání akce
5. 9. 2016
Typ akce podle státní příslušnosti
WRD - Celosvětová akce
Kód UT WoS článku
000389808300016