The utilization of production equipment capacity in relation to total costs of the process in software system EISOD
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F49777513%3A23210%2F10%3A00504527" target="_blank" >RIV/49777513:23210/10:00504527 - isvavai.cz</a>
Výsledek na webu
—
DOI - Digital Object Identifier
—
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
The utilization of production equipment capacity in relation to total costs of the process in software system EISOD
Popis výsledku v původním jazyce
The purpose of this work is to enable the evaluation of the utilization of production equipment capacity in relation to total costs of the process in software system EISOD. At the beginning this work concentrates on basic information of software system EISOD and its business process modelling module ORYX QPM. Then there is a description of procedure of process cost valuation. Costs of the actual process are determined there, and also costs of the process at full capacity utilization for different numbers of shifts. These costs can be compared. This work is based on previous work that names Software products for business process modelling and their potential in cost evaluation.
Název v anglickém jazyce
The utilization of production equipment capacity in relation to total costs of the process in software system EISOD
Popis výsledku anglicky
The purpose of this work is to enable the evaluation of the utilization of production equipment capacity in relation to total costs of the process in software system EISOD. At the beginning this work concentrates on basic information of software system EISOD and its business process modelling module ORYX QPM. Then there is a description of procedure of process cost valuation. Costs of the actual process are determined there, and also costs of the process at full capacity utilization for different numbers of shifts. These costs can be compared. This work is based on previous work that names Software products for business process modelling and their potential in cost evaluation.
Klasifikace
Druh
O - Ostatní výsledky
CEP obor
JP - Průmyslové procesy a zpracování
OECD FORD obor
—
Návaznosti výsledku
Projekt
—
Návaznosti
S - Specificky vyzkum na vysokych skolach
Ostatní
Rok uplatnění
2010
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů