Scheduling of MTO production: FIFO, Priority and Group Scheduling Policy Comparison
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F49777513%3A23210%2F13%3A43921665" target="_blank" >RIV/49777513:23210/13:43921665 - isvavai.cz</a>
Výsledek na webu
—
DOI - Digital Object Identifier
—
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Scheduling of MTO production: FIFO, Priority and Group Scheduling Policy Comparison
Popis výsledku v původním jazyce
This paper is focused on MTO and ETO production as they are usually considered as the most complicated to schedule and control, facing a lot of variability, and problems with long lead times, long setup times, and deadline achievement. According to researches a group scheduling policy was mentioned as possible way to solve some of these problems. Using computer simulation three possible strategies tocontrol the jobs waiting in front of the workstation to be processed are compared in this paper - FIFO, priority according to production delay and group scheduling policy. Values obtained from the simulation runs are compared in the term of average lead times and deadline achievement. Results of this study confirm the benefits coming from re-grouping of thewaiting obs according to their technological similarity in the case that merged batch size is under control.
Název v anglickém jazyce
Scheduling of MTO production: FIFO, Priority and Group Scheduling Policy Comparison
Popis výsledku anglicky
This paper is focused on MTO and ETO production as they are usually considered as the most complicated to schedule and control, facing a lot of variability, and problems with long lead times, long setup times, and deadline achievement. According to researches a group scheduling policy was mentioned as possible way to solve some of these problems. Using computer simulation three possible strategies tocontrol the jobs waiting in front of the workstation to be processed are compared in this paper - FIFO, priority according to production delay and group scheduling policy. Values obtained from the simulation runs are compared in the term of average lead times and deadline achievement. Results of this study confirm the benefits coming from re-grouping of thewaiting obs according to their technological similarity in the case that merged batch size is under control.
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
JP - Průmyslové procesy a zpracování
OECD FORD obor
—
Návaznosti výsledku
Projekt
—
Návaznosti
S - Specificky vyzkum na vysokych skolach
Ostatní
Rok uplatnění
2013
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
International Business Information Management Assosiation (IBIMA)
ISBN
978-0-9860419-1-4
ISSN
—
e-ISSN
—
Počet stran výsledku
9
Strana od-do
1081-1089
Název nakladatele
International Business Information Management Association
Místo vydání
Roma
Místo konání akce
Rome
Datum konání akce
13. 11. 2013
Typ akce podle státní příslušnosti
WRD - Celosvětová akce
Kód UT WoS článku
—