Perspectives of Large Wind Power Plant Installations to the National Transmission Power System of Libya
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F49777513%3A23220%2F11%3A43897908" target="_blank" >RIV/49777513:23220/11:43897908 - isvavai.cz</a>
Výsledek na webu
—
DOI - Digital Object Identifier
—
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Perspectives of Large Wind Power Plant Installations to the National Transmission Power System of Libya
Popis výsledku v původním jazyce
This paper deals with the transmission power system of Libya and its capacity to incorporate renewable power sources, especially large wind power farms. First, the initial load flow case of the eastern part of the Libyan transmission network has been performed. Second, another load flow study has been analyzed to demonstrate the steady-state behaviour (especially voltage and power conditions) of the network when incorporating planned wind power farms for year 2010. Final load flow problem has been strictly defined as an optimization problem to examine maximum possible power generations from prospective wind power farms in selected locations of the eastern network part in 2015 (with estimated loading situations) for maintaining all bus voltages and branch power flows within their permitted limits. Based on these simulations, further research activities in this area will continue.
Název v anglickém jazyce
Perspectives of Large Wind Power Plant Installations to the National Transmission Power System of Libya
Popis výsledku anglicky
This paper deals with the transmission power system of Libya and its capacity to incorporate renewable power sources, especially large wind power farms. First, the initial load flow case of the eastern part of the Libyan transmission network has been performed. Second, another load flow study has been analyzed to demonstrate the steady-state behaviour (especially voltage and power conditions) of the network when incorporating planned wind power farms for year 2010. Final load flow problem has been strictly defined as an optimization problem to examine maximum possible power generations from prospective wind power farms in selected locations of the eastern network part in 2015 (with estimated loading situations) for maintaining all bus voltages and branch power flows within their permitted limits. Based on these simulations, further research activities in this area will continue.
Klasifikace
Druh
C - Kapitola v odborné knize
CEP obor
JE - Nejaderná energetika, spotřeba a užití energie
OECD FORD obor
—
Návaznosti výsledku
Projekt
—
Návaznosti
S - Specificky vyzkum na vysokych skolach
Ostatní
Rok uplatnění
2011
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název knihy nebo sborníku
Electric Power Engineering and Ecology - Selected Parts I.
ISBN
978-80-7300-417-0
Počet stran výsledku
11
Strana od-do
76-86
Počet stran knihy
96
Název nakladatele
BEN - technická literatura
Místo vydání
Praha
Kód UT WoS kapitoly
—