Reducing of the losses on transmission power lines
Popis výsledku v původním jazyce
Power systems in many states around the world have accepted deregulation. The aim is to reduce the price of electric power and to offer better service to electric power consumers. The transmission field is much more noticeable in the power system deregulation. Many problems of distribution companies are connected with question how the investment to the transmission field could be recovered? The cost of transmission line construction can be recovered from transmission users as a wheeling price. In electric power transmission system, the wheeling is the transportation of electric power over transmission lines. Until now, the wheeling price model has been separated into two methods: a marginal cost method and an embedded cost method. The presented methodof wheeling prices determination will include the loss costs of transmission lines.
Název v anglickém jazyce
Reducing of the losses on transmission power lines
Popis výsledku anglicky
Power systems in many states around the world have accepted deregulation. The aim is to reduce the price of electric power and to offer better service to electric power consumers. The transmission field is much more noticeable in the power system deregulation. Many problems of distribution companies are connected with question how the investment to the transmission field could be recovered? The cost of transmission line construction can be recovered from transmission users as a wheeling price. In electric power transmission system, the wheeling is the transportation of electric power over transmission lines. Until now, the wheeling price model has been separated into two methods: a marginal cost method and an embedded cost method. The presented methodof wheeling prices determination will include the loss costs of transmission lines.
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
JE - Nejaderná energetika, spotřeba a užití energie
OECD FORD obor
—
Návaznosti výsledku
Projekt
—
Návaznosti
S - Specificky vyzkum na vysokych skolach
Ostatní
Rok uplatnění
2013
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
Elektroenergetika 2013: proceedings of the 7th International Scientific Symposium on Electrical Power Engineering
ISBN
978-80-553-1441-9
ISSN
—
e-ISSN
—
Počet stran výsledku
4
Strana od-do
133-136
Název nakladatele
Technical University of Košice
Místo vydání
Košice
Místo konání akce
Stará Lesná
Datum konání akce
18. 9. 2013
Typ akce podle státní příslušnosti
EUR - Evropská akce
Kód UT WoS článku
—