Risk management methodology covering the entire product lifecycle
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F49777513%3A23220%2F13%3A43928521" target="_blank" >RIV/49777513:23220/13:43928521 - isvavai.cz</a>
Výsledek na webu
<a href="http://dx.doi.org/10.1007/978-3-319-00557-7_5" target="_blank" >http://dx.doi.org/10.1007/978-3-319-00557-7_5</a>
DOI - Digital Object Identifier
<a href="http://dx.doi.org/10.1007/978-3-319-00557-7_5" target="_blank" >10.1007/978-3-319-00557-7_5</a>
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Risk management methodology covering the entire product lifecycle
Popis výsledku v původním jazyce
This paper deals with a new risk management methodology covering the entire product lifecycle. Since, no complex and lucid methodology involving all product lifecycle phases has ever occurred. Currently, not all phases are covered or different risk management methods are used for single phases. The proposed methodology copes with two types of risks which may occur during the life-cycle. Predictive risk are the first type and incident investigation the second. At the beginning of an each phase, all possible risks entering the process are considered. These risks are taken into consideration during the entire cycle. Nevertheless, some risk may stay undiscovered and impact. Then incident investigation starts in order to identify risks. The identified risksare treated and considered. Generally, it can be said the methodology makes a closed and never-ending circle of risk management. It is a part of universal process improvement.
Název v anglickém jazyce
Risk management methodology covering the entire product lifecycle
Popis výsledku anglicky
This paper deals with a new risk management methodology covering the entire product lifecycle. Since, no complex and lucid methodology involving all product lifecycle phases has ever occurred. Currently, not all phases are covered or different risk management methods are used for single phases. The proposed methodology copes with two types of risks which may occur during the life-cycle. Predictive risk are the first type and incident investigation the second. At the beginning of an each phase, all possible risks entering the process are considered. These risks are taken into consideration during the entire cycle. Nevertheless, some risk may stay undiscovered and impact. Then incident investigation starts in order to identify risks. The identified risksare treated and considered. Generally, it can be said the methodology makes a closed and never-ending circle of risk management. It is a part of universal process improvement.
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
AE - Řízení, správa a administrativa
OECD FORD obor
—
Návaznosti výsledku
Projekt
<a href="/cs/project/ED2.1.00%2F03.0094" target="_blank" >ED2.1.00/03.0094: Regionální inovační centrum elektrotechniky (RICE)</a><br>
Návaznosti
P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)
Ostatní
Rok uplatnění
2013
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
Lecture Notes in Mechanical Engineering
ISBN
978-3-319-00556-0
ISSN
2195-4356
e-ISSN
—
Počet stran výsledku
6
Strana od-do
59-64
Název nakladatele
Springer
Místo vydání
Heidelberg
Místo konání akce
Porto
Datum konání akce
26. 6. 2013
Typ akce podle státní příslušnosti
WRD - Celosvětová akce
Kód UT WoS článku
—