Under frequency load shedding threats in island operation
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F49777513%3A23220%2F17%3A43931880" target="_blank" >RIV/49777513:23220/17:43931880 - isvavai.cz</a>
Výsledek na webu
<a href="http://ieeexplore.ieee.org/document/7967317/" target="_blank" >http://ieeexplore.ieee.org/document/7967317/</a>
DOI - Digital Object Identifier
<a href="http://dx.doi.org/10.1109/EPE.2017.7967317" target="_blank" >10.1109/EPE.2017.7967317</a>
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Under frequency load shedding threats in island operation
Popis výsledku v původním jazyce
Island operation possibility plays nowadays an important role in the view of preserving a part of the power system working during close-to-blackout emergency states such as collapsing power system divided in to smaller parts. Unfortunately following paper shows that not all regulation tools available for the transmission system operator (TSO) which are secured by the national grid code might be used during the island operation (respectively speed control mode of the power sources) for the same purpose of preventing frequency collapse. Under Frequency Load Shedding (ULFS) might cause an automatic disconnection of the working power station. This topic is demonstrated on an example system (city of Pilsen) on reality based input data. In the end the question of further research and solutions are discussed.
Název v anglickém jazyce
Under frequency load shedding threats in island operation
Popis výsledku anglicky
Island operation possibility plays nowadays an important role in the view of preserving a part of the power system working during close-to-blackout emergency states such as collapsing power system divided in to smaller parts. Unfortunately following paper shows that not all regulation tools available for the transmission system operator (TSO) which are secured by the national grid code might be used during the island operation (respectively speed control mode of the power sources) for the same purpose of preventing frequency collapse. Under Frequency Load Shedding (ULFS) might cause an automatic disconnection of the working power station. This topic is demonstrated on an example system (city of Pilsen) on reality based input data. In the end the question of further research and solutions are discussed.
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
—
OECD FORD obor
20201 - Electrical and electronic engineering
Návaznosti výsledku
Projekt
—
Návaznosti
S - Specificky vyzkum na vysokych skolach
Ostatní
Rok uplatnění
2017
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
Proceedings of the 2017 18th International Scientific Conference on Electric Power Engineering (EPE)
ISBN
978-1-5090-6405-2
ISSN
—
e-ISSN
neuvedeno
Počet stran výsledku
4
Strana od-do
57-60
Název nakladatele
IEEE
Místo vydání
Piscataway
Místo konání akce
Kouty nad Desnou, Czech Republic
Datum konání akce
17. 5. 2017
Typ akce podle státní příslušnosti
WRD - Celosvětová akce
Kód UT WoS článku
—