Analysis of the unplanned shutdowns and estimation of reliability in Temelin
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F49777513%3A23220%2F18%3A43951373" target="_blank" >RIV/49777513:23220/18:43951373 - isvavai.cz</a>
Výsledek na webu
<a href="https://ieeexplore.ieee.org/document/8395953" target="_blank" >https://ieeexplore.ieee.org/document/8395953</a>
DOI - Digital Object Identifier
<a href="http://dx.doi.org/10.1109/EPE.2018.8395953" target="_blank" >10.1109/EPE.2018.8395953</a>
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Analysis of the unplanned shutdowns and estimation of reliability in Temelin
Popis výsledku v původním jazyce
The paper concerns the creation of the analysis of the unplanned shutdowns and estimation of reliability. This analysis is based on the document of all unplanned shutdowns for both units in the Czech nuclear power plant Temelin. This investigation is mainly focused on failures of some components, which have significant impact of the decrease of electrical power during operation of the power plant. Thanks to this analysis, we are able to perform the estimation of reliability of the power plant. The estimation is created in Dymola software and gives us certain information of the failures of key components, which must be solved in the future. The determination of the key components is very important step for the modeling of reliability of this power plant.
Název v anglickém jazyce
Analysis of the unplanned shutdowns and estimation of reliability in Temelin
Popis výsledku anglicky
The paper concerns the creation of the analysis of the unplanned shutdowns and estimation of reliability. This analysis is based on the document of all unplanned shutdowns for both units in the Czech nuclear power plant Temelin. This investigation is mainly focused on failures of some components, which have significant impact of the decrease of electrical power during operation of the power plant. Thanks to this analysis, we are able to perform the estimation of reliability of the power plant. The estimation is created in Dymola software and gives us certain information of the failures of key components, which must be solved in the future. The determination of the key components is very important step for the modeling of reliability of this power plant.
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
—
OECD FORD obor
20305 - Nuclear related engineering; (nuclear physics to be 1.3);
Návaznosti výsledku
Projekt
<a href="/cs/project/TH02020798" target="_blank" >TH02020798: Podpora výcviku obsluhy blokové dozorny JE na simulátoru za pomoci automatického sběru dat z výcviku scénářů abnormálních a mimořádných stavů</a><br>
Návaznosti
S - Specificky vyzkum na vysokych skolach
Ostatní
Rok uplatnění
2018
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
Proceedings of the 2018 19th International Scientific Conference on Electric Power Engineering (EPE)
ISBN
978-1-5386-4612-0
ISSN
2376-5623
e-ISSN
2376-5631
Počet stran výsledku
6
Strana od-do
551-556
Název nakladatele
IEEE
Místo vydání
Piscataway
Místo konání akce
Brno, Česká republika
Datum konání akce
16. 5. 2018
Typ akce podle státní příslušnosti
WRD - Celosvětová akce
Kód UT WoS článku
000439649500105