MONTE CARLO SIMULATION OF POWER BALANCE CONTROL IN TRANSMISSION GRID
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F49777513%3A23520%2F14%3A43923261" target="_blank" >RIV/49777513:23520/14:43923261 - isvavai.cz</a>
Výsledek na webu
<a href="http://www.actapress.com/Content_of_Journal.aspx?JournalID=184" target="_blank" >http://www.actapress.com/Content_of_Journal.aspx?JournalID=184</a>
DOI - Digital Object Identifier
<a href="http://dx.doi.org/10.2316/Journal.203.2014.1.203-5143" target="_blank" >10.2316/Journal.203.2014.1.203-5143</a>
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
MONTE CARLO SIMULATION OF POWER BALANCE CONTROL IN TRANSMISSION GRID
Popis výsledku v původním jazyce
Power balance in an electricity transmission system is one of services that an electricity transmission system operator has to guarantee. This means that power export or import to or from surrounding interconnected electricity transmission systems shouldbe kept at given values. A power balance deviation in the electricity transmission system behaves as a stochastic process. Consequently, the aim of control strategy of such a quantity is to keep its amplitudes within specified boundaries centreed aroundzero. The electricity transmission system operator uses ancillary services for the control. The question is whether power reserves of the services are sufficient for reliable operation of the electricity transmission system. A Monte Carlo simulator hasbeen developed for such a purpose. The simulator models behaviour of the system under constraints given by the power reserves of the services.
Název v anglickém jazyce
MONTE CARLO SIMULATION OF POWER BALANCE CONTROL IN TRANSMISSION GRID
Popis výsledku anglicky
Power balance in an electricity transmission system is one of services that an electricity transmission system operator has to guarantee. This means that power export or import to or from surrounding interconnected electricity transmission systems shouldbe kept at given values. A power balance deviation in the electricity transmission system behaves as a stochastic process. Consequently, the aim of control strategy of such a quantity is to keep its amplitudes within specified boundaries centreed aroundzero. The electricity transmission system operator uses ancillary services for the control. The question is whether power reserves of the services are sufficient for reliable operation of the electricity transmission system. A Monte Carlo simulator hasbeen developed for such a purpose. The simulator models behaviour of the system under constraints given by the power reserves of the services.
Klasifikace
Druh
J<sub>x</sub> - Nezařazeno - Článek v odborném periodiku (Jimp, Jsc a Jost)
CEP obor
JE - Nejaderná energetika, spotřeba a užití energie
OECD FORD obor
—
Návaznosti výsledku
Projekt
<a href="/cs/project/TA01020865" target="_blank" >TA01020865: Výzkum a vývoj metod a nástrojů pro podporu rozhodování v procesu bezpečné integrace elektráren využívajících obnovitelných zdrojů energie (BIOZE) do elektrizační soustavy ČR</a><br>
Návaznosti
P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)
Ostatní
Rok uplatnění
2014
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název periodika
International Journal of Power and Energy Systems
ISSN
1078-3466
e-ISSN
—
Svazek periodika
34
Číslo periodika v rámci svazku
1
Stát vydavatele periodika
CA - Kanada
Počet stran výsledku
9
Strana od-do
26-34
Kód UT WoS článku
—
EID výsledku v databázi Scopus
—