Engineer Construction of Provisional Bridges in the Army of Czech Republic
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F60162694%3AG43__%2F17%3A00534112" target="_blank" >RIV/60162694:G43__/17:00534112 - isvavai.cz</a>
Výsledek na webu
<a href="http://link.springer.com/chapter/10.1007/978-981-10-3247-9_21" target="_blank" >http://link.springer.com/chapter/10.1007/978-981-10-3247-9_21</a>
DOI - Digital Object Identifier
<a href="http://dx.doi.org/10.1007/978-981-10-3247-9_21" target="_blank" >10.1007/978-981-10-3247-9_21</a>
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Engineer Construction of Provisional Bridges in the Army of Czech Republic
Popis výsledku v původním jazyce
This chapter analyzed the issue of provisional bridges engineer superstructures - mechanized bridges in the Army of the Czech Republic (ACR). Current devices are outdated and their parameters no longer correspond to the real needs of our military. Mechanized bridges are devices for rapid and effective security units move through impassable places (water obstacles, trenches, walls, etc.). They are designed not only for ACR units but also for transport means for intervention in emergency situations (floods, and other natural disasters) within the Integrated Rescue System (IRS). The chapter shows one of the options approach to modernization solutions to this type of provisional bridges, which is based on an analysis of current and real needs of the ACR.
Název v anglickém jazyce
Engineer Construction of Provisional Bridges in the Army of Czech Republic
Popis výsledku anglicky
This chapter analyzed the issue of provisional bridges engineer superstructures - mechanized bridges in the Army of the Czech Republic (ACR). Current devices are outdated and their parameters no longer correspond to the real needs of our military. Mechanized bridges are devices for rapid and effective security units move through impassable places (water obstacles, trenches, walls, etc.). They are designed not only for ACR units but also for transport means for intervention in emergency situations (floods, and other natural disasters) within the Integrated Rescue System (IRS). The chapter shows one of the options approach to modernization solutions to this type of provisional bridges, which is based on an analysis of current and real needs of the ACR.
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
—
OECD FORD obor
20101 - Civil engineering
Návaznosti výsledku
Projekt
—
Návaznosti
I - Institucionalni podpora na dlouhodoby koncepcni rozvoj vyzkumne organizace
Ostatní
Rok uplatnění
2017
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
Durability of Critical Infrastructure, Monitoring and Testing - Lecture Notes in Mechanical Engineering
ISBN
978-981-10-3246-2
ISSN
2195-4356
e-ISSN
—
Počet stran výsledku
8
Strana od-do
183-190
Název nakladatele
SPRINGER-VERLAG SINGAPORE PTE LTD, SINGAPORE
Místo vydání
SINGAPORE
Místo konání akce
Satov, CZECH REPUBLIC
Datum konání akce
6. 12. 2016
Typ akce podle státní příslušnosti
WRD - Celosvětová akce
Kód UT WoS článku
000419058500021