Reliability and risk treatment centred maintenance
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F60460709%3A41310%2F13%3A62311" target="_blank" >RIV/60460709:41310/13:62311 - isvavai.cz</a>
Výsledek na webu
—
DOI - Digital Object Identifier
—
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Reliability and risk treatment centred maintenance
Popis výsledku v původním jazyce
The paper brings a proposal of new methodology for application of well-known tools - RCM, RBI and SIFpro - with the aim to treat risks by means of suitable maintenance. The basis of the new methodology is the proposal of complex application of all threemethods at the same time and not separately as typical today. The proposed methodology suggests having just one managing team for Reliability and Risk Treatment Centred Maintenance (RRTCM) employing existing RCM, RBI, and SIFpro tools concurrently. Thisapproach allows for significant reduction of engineering activities' duration. In the proposed methodology these activities are staged into 5 phases and structured in order to eliminate all duplicities resulting from separate application of the three tools. The newly proposed methodology saves 45% to 50% of the engineering workload and adequate significant financial savings.
Název v anglickém jazyce
Reliability and risk treatment centred maintenance
Popis výsledku anglicky
The paper brings a proposal of new methodology for application of well-known tools - RCM, RBI and SIFpro - with the aim to treat risks by means of suitable maintenance. The basis of the new methodology is the proposal of complex application of all threemethods at the same time and not separately as typical today. The proposed methodology suggests having just one managing team for Reliability and Risk Treatment Centred Maintenance (RRTCM) employing existing RCM, RBI, and SIFpro tools concurrently. Thisapproach allows for significant reduction of engineering activities' duration. In the proposed methodology these activities are staged into 5 phases and structured in order to eliminate all duplicities resulting from separate application of the three tools. The newly proposed methodology saves 45% to 50% of the engineering workload and adequate significant financial savings.
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
JR - Ostatní strojírenství
OECD FORD obor
—
Návaznosti výsledku
Projekt
<a href="/cs/project/FR-TI2%2F202" target="_blank" >FR-TI2/202: Informační systém monitoringu efektivity a výkonnosti výrobních zařízení - OEE-DTM.</a><br>
Návaznosti
P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)
Ostatní
Rok uplatnění
2013
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
QR2MSE 2013 - Proceedings of 2013 International Conference on Quality, Reliability, Risk, Maintenance, and Safety Engineering
ISBN
978-1-4799-1016-8
ISSN
—
e-ISSN
—
Počet stran výsledku
6
Strana od-do
610-615
Název nakladatele
The maintenance Professional Committee of China Ordnance Industry Society
Místo vydání
China
Místo konání akce
China
Datum konání akce
15. 7. 2013
Typ akce podle státní příslušnosti
WRD - Celosvětová akce
Kód UT WoS článku
—