Dirty-Hold Time Effect on the Cleaning Process Efficiency
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F60461373%3A22310%2F12%3A43894830" target="_blank" >RIV/60461373:22310/12:43894830 - isvavai.cz</a>
Výsledek na webu
<a href="http://www.sciencedirect.com/science/article/pii/S1877705812028342" target="_blank" >http://www.sciencedirect.com/science/article/pii/S1877705812028342</a>
DOI - Digital Object Identifier
<a href="http://dx.doi.org/10.1016/j.proeng.2012.07.434" target="_blank" >10.1016/j.proeng.2012.07.434</a>
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Dirty-Hold Time Effect on the Cleaning Process Efficiency
Popis výsledku v původním jazyce
The paper evaluated the efficiency of a standard cleaning procedure of the process equipment after production of anti hypertensive with the active component Losartan Potassium for different lengths of time between completion of production and the start of the treatment process - so called dirty-hold time. It has been found that the cleaning process is appropriately designed and efficient. The concentration of losartan in swabs from the equipments was in all cases within the limits of acceptance criteria. However, the washing process was in all cases sufficiently effective to meet the eligibility criteria, significant effect of the time of weaning of the contaminated equipment on the efficiency of the washing process was found. At studied dirty hold time horizon (0-4 days) there was a progressive deterioration of the efficiency of the cleaning process. It was found that the influence of the nature of the residual material on the cleaning process has minor effect then the length of the d
Název v anglickém jazyce
Dirty-Hold Time Effect on the Cleaning Process Efficiency
Popis výsledku anglicky
The paper evaluated the efficiency of a standard cleaning procedure of the process equipment after production of anti hypertensive with the active component Losartan Potassium for different lengths of time between completion of production and the start of the treatment process - so called dirty-hold time. It has been found that the cleaning process is appropriately designed and efficient. The concentration of losartan in swabs from the equipments was in all cases within the limits of acceptance criteria. However, the washing process was in all cases sufficiently effective to meet the eligibility criteria, significant effect of the time of weaning of the contaminated equipment on the efficiency of the washing process was found. At studied dirty hold time horizon (0-4 days) there was a progressive deterioration of the efficiency of the cleaning process. It was found that the influence of the nature of the residual material on the cleaning process has minor effect then the length of the d
Klasifikace
Druh
J<sub>x</sub> - Nezařazeno - Článek v odborném periodiku (Jimp, Jsc a Jost)
CEP obor
CI - Průmyslová chemie a chemické inženýrství
OECD FORD obor
—
Návaznosti výsledku
Projekt
—
Návaznosti
Z - Vyzkumny zamer (s odkazem do CEZ)
Ostatní
Rok uplatnění
2012
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název periodika
Procedia Engineering
ISSN
1877-7058
e-ISSN
—
Svazek periodika
42
Číslo periodika v rámci svazku
September
Stát vydavatele periodika
NL - Nizozemsko
Počet stran výsledku
6
Strana od-do
431-436