Optimální plánování víceproduktových vsádkových výrob pro objednávky s různými dodacími termíny
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F60461373%3A22340%2F04%3A00011060" target="_blank" >RIV/60461373:22340/04:00011060 - isvavai.cz</a>
Výsledek na webu
—
DOI - Digital Object Identifier
—
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Optimum Planning of Multiproduct Batch Plants satisfying Orders with Different Due-dates
Popis výsledku v původním jazyce
In a multiproduct batch plant a number of different products are produced on the basis of customer orders. Considering the limited capacity of the line, products are to be produced in several successive batches until required amounts of products are produced. Short-term planning starts with a batching procedure - formation of the list of product orders and corresponding set of batches within current planning horizon. Then minimization of a suitable goal function (usually the total overdue of all productdue-dates) is carried out. For the current orders the optimum short-term production plan can be drawn. It meets the requirements on the amounts and assortments of the products and if possible the due-dates too. During optimization of plans they are evaluated by simulation experiments with a model of a multiproduct batch plant in Witness simulation program environment. Discrete optimization is carried out by means of Witness Optimizer plug-in module.
Název v anglickém jazyce
Optimum Planning of Multiproduct Batch Plants satisfying Orders with Different Due-dates
Popis výsledku anglicky
In a multiproduct batch plant a number of different products are produced on the basis of customer orders. Considering the limited capacity of the line, products are to be produced in several successive batches until required amounts of products are produced. Short-term planning starts with a batching procedure - formation of the list of product orders and corresponding set of batches within current planning horizon. Then minimization of a suitable goal function (usually the total overdue of all productdue-dates) is carried out. For the current orders the optimum short-term production plan can be drawn. It meets the requirements on the amounts and assortments of the products and if possible the due-dates too. During optimization of plans they are evaluated by simulation experiments with a model of a multiproduct batch plant in Witness simulation program environment. Discrete optimization is carried out by means of Witness Optimizer plug-in module.
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
JD - Využití počítačů, robotika a její aplikace
OECD FORD obor
—
Návaznosti výsledku
Projekt
—
Návaznosti
Z - Vyzkumny zamer (s odkazem do CEZ)
Ostatní
Rok uplatnění
2004
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
Proc. of the 6th International Scientific-Technical Conference Process Control 2004
ISBN
80-7194-662-1
ISSN
—
e-ISSN
—
Počet stran výsledku
8
Strana od-do
"R191/1"-"R191/8"
Název nakladatele
Univerzita Pardubice
Místo vydání
Pardubice
Místo konání akce
Kouty nad Desnou
Datum konání akce
8. 6. 2004
Typ akce podle státní příslušnosti
EUR - Evropská akce