Zlepšování využití víceproduktových várkových výrob pomocí mezioperačních zásobníků
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F60461373%3A22340%2F05%3A00014348" target="_blank" >RIV/60461373:22340/05:00014348 - isvavai.cz</a>
Výsledek na webu
—
DOI - Digital Object Identifier
—
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Multiproduct Batch Plants Utilization Improving by Means of Intermediate Storage
Popis výsledku v původním jazyce
Productivity of multiproduct batch plants is markedly influenced by bottleneck apparatuses. The bottlenecks can be identified by several criteria, e.g. high apparatus utilization, blocking of apparatuses prior to a bottleneck, etc. Different processing times for corresponding operations of multiproduct processes cause the bottleneck to move from operation to operation depending on the produced products, i.e., floating bottlenecks occur. The bottlenecks of a multiproduct line can be in some measure resolved by placing of intermediate storage before the critical apparatus. A simulation study of a model multiproduct line was carried out and based on the simulation experiments intermediate storage units were placed into the line. The results were comparedwith those of intermediate storage placement optimization. All mathematical and simulation calculations were carried out by means of Witness 2004 simulation software; Witness Optimizer 4.1 optimization module was used for optimization.
Název v anglickém jazyce
Multiproduct Batch Plants Utilization Improving by Means of Intermediate Storage
Popis výsledku anglicky
Productivity of multiproduct batch plants is markedly influenced by bottleneck apparatuses. The bottlenecks can be identified by several criteria, e.g. high apparatus utilization, blocking of apparatuses prior to a bottleneck, etc. Different processing times for corresponding operations of multiproduct processes cause the bottleneck to move from operation to operation depending on the produced products, i.e., floating bottlenecks occur. The bottlenecks of a multiproduct line can be in some measure resolved by placing of intermediate storage before the critical apparatus. A simulation study of a model multiproduct line was carried out and based on the simulation experiments intermediate storage units were placed into the line. The results were comparedwith those of intermediate storage placement optimization. All mathematical and simulation calculations were carried out by means of Witness 2004 simulation software; Witness Optimizer 4.1 optimization module was used for optimization.
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
JD - Využití počítačů, robotika a její aplikace
OECD FORD obor
—
Návaznosti výsledku
Projekt
—
Návaznosti
Z - Vyzkumny zamer (s odkazem do CEZ)
Ostatní
Rok uplatnění
2005
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
Proc. of 32th International Conference of Slovak Society of Chemical Engineering.
ISBN
80-227-2224-3
ISSN
—
e-ISSN
—
Počet stran výsledku
7
Strana od-do
—
Název nakladatele
Slovak University of Technology
Místo vydání
Bratislava
Místo konání akce
Tatranské Matliare
Datum konání akce
18. 4. 2005
Typ akce podle státní příslušnosti
WRD - Celosvětová akce
Kód UT WoS článku
—