Eliminace úzkých míst víceproduktových várkových výrob pomocí analýzy jejich výkonu
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F60461373%3A22340%2F06%3A00016741" target="_blank" >RIV/60461373:22340/06:00016741 - isvavai.cz</a>
Výsledek na webu
—
DOI - Digital Object Identifier
—
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Debottlenecking of Multiproduct Batch Plants by Throughput Analysis
Popis výsledku v původním jazyce
The contribution deals with problems connected with bottlenecks that limit the throughput of multiproduct batch plants. The bottleneck of a multiproduct batch plant is a manufacturing unit that limits the plant throughput in the strongest manner. This type of bottleneck is known as time or scheduling bottleneck. They can be identified by analyzing relationships between blockage and starvation of production units. Different cycle times for different products can move the bottleneck from an operation to another one depending on products, so that a floating bottleneck can occur. By alternation of products according to a suitable production plan is possible to avoid full developing of bottlenecks and so eliminate them. The described method of plant debottlenecking enables to increase batch plant throughput with no or minimum possible capital investments.
Název v anglickém jazyce
Debottlenecking of Multiproduct Batch Plants by Throughput Analysis
Popis výsledku anglicky
The contribution deals with problems connected with bottlenecks that limit the throughput of multiproduct batch plants. The bottleneck of a multiproduct batch plant is a manufacturing unit that limits the plant throughput in the strongest manner. This type of bottleneck is known as time or scheduling bottleneck. They can be identified by analyzing relationships between blockage and starvation of production units. Different cycle times for different products can move the bottleneck from an operation to another one depending on products, so that a floating bottleneck can occur. By alternation of products according to a suitable production plan is possible to avoid full developing of bottlenecks and so eliminate them. The described method of plant debottlenecking enables to increase batch plant throughput with no or minimum possible capital investments.
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
CI - Průmyslová chemie a chemické inženýrství
OECD FORD obor
—
Návaznosti výsledku
Projekt
—
Návaznosti
Z - Vyzkumny zamer (s odkazem do CEZ)
Ostatní
Rok uplatnění
2006
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
Proceedings of 33rd International Conference of SSCHE
ISBN
80-227-2409-2
ISSN
—
e-ISSN
—
Počet stran výsledku
9
Strana od-do
—
Název nakladatele
Slovak University of Technology
Místo vydání
Bratislava
Místo konání akce
Tatranské Matliare
Datum konání akce
22. 5. 2006
Typ akce podle státní příslušnosti
EUR - Evropská akce
Kód UT WoS článku
—