Určení kapacity mezioperačního skladu pomocí simulace
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F60461373%3A22340%2F08%3A00020680" target="_blank" >RIV/60461373:22340/08:00020680 - isvavai.cz</a>
Výsledek na webu
—
DOI - Digital Object Identifier
—
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Determining Interstage Storage Capacity by Simulation
Popis výsledku v původním jazyce
Computer simulation of industrial processes is often used for solution of problems of "what if ... " type. Such problems can be solved by conventional numerical methods with difficulties only. It is significantly cheaper and quicker to carry out simulation experiments on models than on the real-life systems. Moreover it is possible to examine not only models of real-life systems and processes but judge their planned modifications. A producer of corrugate board packaging plans to increase production capacity. The corrugating machine produces corrugated board from paper rolls. The strip of board is cut into sheets of required sizes. The sheets are transferred into interstage storage and must be kept in it at least for six hours for technological reasonsto mature. After maturing the sheets are processed in inliners into final forms of packaging. Experiments with the simulation model enable to verify whether the capacity of the interstage storage is sufficient for a new corrugator.
Název v anglickém jazyce
Determining Interstage Storage Capacity by Simulation
Popis výsledku anglicky
Computer simulation of industrial processes is often used for solution of problems of "what if ... " type. Such problems can be solved by conventional numerical methods with difficulties only. It is significantly cheaper and quicker to carry out simulation experiments on models than on the real-life systems. Moreover it is possible to examine not only models of real-life systems and processes but judge their planned modifications. A producer of corrugate board packaging plans to increase production capacity. The corrugating machine produces corrugated board from paper rolls. The strip of board is cut into sheets of required sizes. The sheets are transferred into interstage storage and must be kept in it at least for six hours for technological reasonsto mature. After maturing the sheets are processed in inliners into final forms of packaging. Experiments with the simulation model enable to verify whether the capacity of the interstage storage is sufficient for a new corrugator.
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
JD - Využití počítačů, robotika a její aplikace
OECD FORD obor
—
Návaznosti výsledku
Projekt
—
Návaznosti
Z - Vyzkumny zamer (s odkazem do CEZ)
Ostatní
Rok uplatnění
2008
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
Proceedings the 8th International Scientific - Technological Conference Process Control 2008
ISBN
978-80-7395-077-4
ISSN
—
e-ISSN
—
Počet stran výsledku
8
Strana od-do
—
Název nakladatele
Univerzita Pardubice
Místo vydání
Pardubice
Místo konání akce
Kouty nad Desnou
Datum konání akce
9. 6. 2008
Typ akce podle státní příslušnosti
EUR - Evropská akce
Kód UT WoS článku
—