The Application of Tabu Search Method to the Waste Minimization through Flowshop Sequencing
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F60461373%3A22340%2F99%3A0003276" target="_blank" >RIV/60461373:22340/99:0003276 - isvavai.cz</a>
Výsledek na webu
—
DOI - Digital Object Identifier
—
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
The Application of Tabu Search Method to the Waste Minimization through Flowshop Sequencing
Popis výsledku v původním jazyce
In the multiproduct plant the process tasks for each product can be assigned to a fixed sequence of equipment items. Then, the products are produced in sequential campaigns. Because of the NP-hard nature of the scheduling problem, tabu search heu tabu search heuristic belongs to the approaches that allow to speed-up the computational process considerable. We have tested various modifications of tabu search method and found the best values of parameters and the best modification the or search algorithm.Usually the total processing time (makespan) is as objective function minimized. But during product changeover various effluents, waste and nonstandard products arise and increase cost of their cost of its treatment are usually processing sequence dependent. That?s why our emphasis is now posed on searching of such a schedule that minimize waste treatment costs or product changeover costs generally
Název v anglickém jazyce
The Application of Tabu Search Method to the Waste Minimization through Flowshop Sequencing
Popis výsledku anglicky
In the multiproduct plant the process tasks for each product can be assigned to a fixed sequence of equipment items. Then, the products are produced in sequential campaigns. Because of the NP-hard nature of the scheduling problem, tabu search heu tabu search heuristic belongs to the approaches that allow to speed-up the computational process considerable. We have tested various modifications of tabu search method and found the best values of parameters and the best modification the or search algorithm.Usually the total processing time (makespan) is as objective function minimized. But during product changeover various effluents, waste and nonstandard products arise and increase cost of their cost of its treatment are usually processing sequence dependent. That?s why our emphasis is now posed on searching of such a schedule that minimize waste treatment costs or product changeover costs generally
Klasifikace
Druh
A - Audiovizuální tvorba
CEP obor
CI - Průmyslová chemie a chemické inženýrství
OECD FORD obor
—
Návaznosti výsledku
Projekt
—
Návaznosti
Z - Vyzkumny zamer (s odkazem do CEZ)
Ostatní
Rok uplatnění
1999
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
ISBN
80-85988-32-1
Místo vydání
Ostrava, Czech Repub
Název nakladatele resp. objednatele
33rd Spring International Conference Modelling and Simulation of Systems MOSIS '99
Verze
—
Identifikační číslo nosiče
—