Analýza spolehlivosti štíhlého železobetonového prutu pomocí pravděpodobnostní metody SBRA
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F61989100%3A27120%2F08%3A00018643" target="_blank" >RIV/61989100:27120/08:00018643 - isvavai.cz</a>
Výsledek na webu
—
DOI - Digital Object Identifier
—
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Reliability analysis of a slender reinforced concrete column using probabilistic SBRA method
Popis výsledku v původním jazyce
Modern supporting reinforced concrete structures, i.e. columns, piers, frame legs, etc., are characteristics by their higher slenderness. Effects of external forces on these structures are significantly dependent on their deformations. In the reliabilityassessment of these structures it is necessary to deal with the equilibrium of internal and external forces acting on deformed structure. Rapidly growing potential of computer technology allows utilize fully probabilistic methods of reliability assessment of structures. The subject of this paper is probabilistic safety assessment of slender reinforced concrete column loaded by eccentric compressive force. The solution is based on fully probabilistic SBRA method using Monte Carlo simulation technique.
Název v anglickém jazyce
Reliability analysis of a slender reinforced concrete column using probabilistic SBRA method
Popis výsledku anglicky
Modern supporting reinforced concrete structures, i.e. columns, piers, frame legs, etc., are characteristics by their higher slenderness. Effects of external forces on these structures are significantly dependent on their deformations. In the reliabilityassessment of these structures it is necessary to deal with the equilibrium of internal and external forces acting on deformed structure. Rapidly growing potential of computer technology allows utilize fully probabilistic methods of reliability assessment of structures. The subject of this paper is probabilistic safety assessment of slender reinforced concrete column loaded by eccentric compressive force. The solution is based on fully probabilistic SBRA method using Monte Carlo simulation technique.
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
JN - Stavebnictví
OECD FORD obor
—
Návaznosti výsledku
Projekt
<a href="/cs/project/GA103%2F07%2F0557" target="_blank" >GA103/07/0557: Pravděpodobnostní posuzování inženýrské spolehlivosti konstrukcí</a><br>
Návaznosti
P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)
Ostatní
Rok uplatnění
2008
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
Reliability, Safety and Diagnostics of Transport Structrues and Means 2008
ISBN
978-80-7395-096-5
ISSN
—
e-ISSN
—
Počet stran výsledku
8
Strana od-do
—
Název nakladatele
University of Pardubice
Místo vydání
Pardubice
Místo konání akce
—
Datum konání akce
—
Typ akce podle státní příslušnosti
—
Kód UT WoS článku
—