SEISMIC RESPONSE HYDRAULIC HAMMER ON THE SECUNDARY LINING TUNNEL
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F61989100%3A27120%2F12%3A86083540" target="_blank" >RIV/61989100:27120/12:86083540 - isvavai.cz</a>
Výsledek na webu
<a href="http://dx.doi.org/10.2478/v10160-012-0027-1" target="_blank" >http://dx.doi.org/10.2478/v10160-012-0027-1</a>
DOI - Digital Object Identifier
<a href="http://dx.doi.org/10.2478/v10160-012-0027-1" target="_blank" >10.2478/v10160-012-0027-1</a>
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
SEISMIC RESPONSE HYDRAULIC HAMMER ON THE SECUNDARY LINING TUNNEL
Popis výsledku v původním jazyce
Construction and subsequent tunnels collapse of the Jablunkovsk?s pass are already among well known of the professional public. After the collapse left part of the tunnel already standing with secondary lining. The second part was temporarilied concretesecured stopper and heavy bridge formwork. During the progress of work was already reached that stage when plug must be removed. The stopper was removed by combination of blasting operations and hydraulic hammer. This article deals with seismic effect hydraulic hammer. It is therefore a unique measuring effect of vibration on the final tunnel lining. A vibration downturn was monitored in the first meters of the lining and the records were evaluated in the amplitude and frequency resort. This assessmentwas made on the basis CSN 73 0040.
Název v anglickém jazyce
SEISMIC RESPONSE HYDRAULIC HAMMER ON THE SECUNDARY LINING TUNNEL
Popis výsledku anglicky
Construction and subsequent tunnels collapse of the Jablunkovsk?s pass are already among well known of the professional public. After the collapse left part of the tunnel already standing with secondary lining. The second part was temporarilied concretesecured stopper and heavy bridge formwork. During the progress of work was already reached that stage when plug must be removed. The stopper was removed by combination of blasting operations and hydraulic hammer. This article deals with seismic effect hydraulic hammer. It is therefore a unique measuring effect of vibration on the final tunnel lining. A vibration downturn was monitored in the first meters of the lining and the records were evaluated in the amplitude and frequency resort. This assessmentwas made on the basis CSN 73 0040.
Klasifikace
Druh
J<sub>x</sub> - Nezařazeno - Článek v odborném periodiku (Jimp, Jsc a Jost)
CEP obor
JM - Inženýrské stavitelství
OECD FORD obor
—
Návaznosti výsledku
Projekt
—
Návaznosti
S - Specificky vyzkum na vysokych skolach
Ostatní
Rok uplatnění
2012
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název periodika
Transactions of the VŠB - Technical University of Ostrava
ISSN
1804-4824
e-ISSN
—
Svazek periodika
12
Číslo periodika v rámci svazku
2
Stát vydavatele periodika
PL - Polská republika
Počet stran výsledku
11
Strana od-do
1-11
Kód UT WoS článku
—
EID výsledku v databázi Scopus
—