Laboratory measurements and numerical modeling of pre-stressed masonry
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F61989100%3A27120%2F13%3A86085950" target="_blank" >RIV/61989100:27120/13:86085950 - isvavai.cz</a>
Výsledek na webu
—
DOI - Digital Object Identifier
—
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Laboratory measurements and numerical modeling of pre-stressed masonry
Popis výsledku v původním jazyce
Pre-stressing of masonry is one of the most widespread building/facility reconstruction methods. In the Czech Republic it is very successful, especially in the Moravian-Silesian Region, which is subject to a considerable amount of disturbances of buildings/facilities due to undermining. Pre-stressing in masonry can be achieved by means of steel wire ropes or rods. These steel elements are inserted into the pre-milled grooves, which may be in the external or internal wall face. The ends of the steel elements are clamped into steel angles or special anchors. In these reconstruction methods it is necessary to follow the pre-stressing procedures and technologies. It is important to properly select the pre-stressing anchoring system, appropriate layout andarrangement of pre-stressing wires, pre-stressing procedure and dimension of pre-stressing forces in the individual wires. This contribution deals with experimental measurements of deformations in the place exposed to local load caused by
Název v anglickém jazyce
Laboratory measurements and numerical modeling of pre-stressed masonry
Popis výsledku anglicky
Pre-stressing of masonry is one of the most widespread building/facility reconstruction methods. In the Czech Republic it is very successful, especially in the Moravian-Silesian Region, which is subject to a considerable amount of disturbances of buildings/facilities due to undermining. Pre-stressing in masonry can be achieved by means of steel wire ropes or rods. These steel elements are inserted into the pre-milled grooves, which may be in the external or internal wall face. The ends of the steel elements are clamped into steel angles or special anchors. In these reconstruction methods it is necessary to follow the pre-stressing procedures and technologies. It is important to properly select the pre-stressing anchoring system, appropriate layout andarrangement of pre-stressing wires, pre-stressing procedure and dimension of pre-stressing forces in the individual wires. This contribution deals with experimental measurements of deformations in the place exposed to local load caused by
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
JN - Stavebnictví
OECD FORD obor
—
Návaznosti výsledku
Projekt
—
Návaznosti
S - Specificky vyzkum na vysokych skolach
Ostatní
Rok uplatnění
2013
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
Procedia Engineering. Volume 65
ISBN
—
ISSN
1877-7058
e-ISSN
—
Počet stran výsledku
6
Strana od-do
411-416
Název nakladatele
Elsevier
Místo vydání
SAN DIEGO
Místo konání akce
Terchová
Datum konání akce
23. 10. 2013
Typ akce podle státní příslušnosti
EUR - Evropská akce
Kód UT WoS článku
—