3D numerical analysis of primary tunnel lining
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F61989100%3A27120%2F15%3A86095659" target="_blank" >RIV/61989100:27120/15:86095659 - isvavai.cz</a>
Výsledek na webu
<a href="http://dx.doi.org/10.5593/SGEM2015/B12/S2.001" target="_blank" >http://dx.doi.org/10.5593/SGEM2015/B12/S2.001</a>
DOI - Digital Object Identifier
<a href="http://dx.doi.org/10.5593/SGEM2015/B12/S2.001" target="_blank" >10.5593/SGEM2015/B12/S2.001</a>
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
3D numerical analysis of primary tunnel lining
Popis výsledku v původním jazyce
A considerable number of the contemporary underground long works is built after the principles of New Austrian Tunneling Method (NATM). The tunnel lining is built as a double-layer structure (primary and secondary tunnel lining). The primary tunnel lining provides a transient ground support before the construction of a secondary lining is finished and takes up the permanent support of ground. In addition a response of the primary lining controls the oncoming ground load on the secondary lining. The article presents results of 3D analysis of stress-strain state in a primary tunnel lining in the course of lining construction steps and after its completion. The analysis takes into account all the significant elements of NATM such as controlled support therock mass shortly after work excavation, heterogeneous cross section of primary tunnel lining - shotcrete, steel elements, their spatial distribution in the cross section of the lining and shotcrete variable deformation parameters in tim
Název v anglickém jazyce
3D numerical analysis of primary tunnel lining
Popis výsledku anglicky
A considerable number of the contemporary underground long works is built after the principles of New Austrian Tunneling Method (NATM). The tunnel lining is built as a double-layer structure (primary and secondary tunnel lining). The primary tunnel lining provides a transient ground support before the construction of a secondary lining is finished and takes up the permanent support of ground. In addition a response of the primary lining controls the oncoming ground load on the secondary lining. The article presents results of 3D analysis of stress-strain state in a primary tunnel lining in the course of lining construction steps and after its completion. The analysis takes into account all the significant elements of NATM such as controlled support therock mass shortly after work excavation, heterogeneous cross section of primary tunnel lining - shotcrete, steel elements, their spatial distribution in the cross section of the lining and shotcrete variable deformation parameters in tim
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
JM - Inženýrské stavitelství
OECD FORD obor
—
Návaznosti výsledku
Projekt
—
Návaznosti
S - Specificky vyzkum na vysokych skolach
Ostatní
Rok uplatnění
2015
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
SGEM 2015 : 15th international multidisciplinary scientific geoconference : conference proceedings : 18-24 June, 2015, Albena, Bulgaria. Science and Technologies in Geology, Exploration and Mining. Volume II
ISBN
978-619-7105-32-2
ISSN
1314-2704
e-ISSN
—
Počet stran výsledku
6
Strana od-do
3-8
Název nakladatele
STEF92 Technology Ltd.
Místo vydání
Sofia
Místo konání akce
Albena
Datum konání akce
18. 6. 2015
Typ akce podle státní příslušnosti
WRD - Celosvětová akce
Kód UT WoS článku
—