Vše

Co hledáte?

Vše
Projekty
Výsledky výzkumu
Subjekty

Rychlé hledání

  • Projekty podpořené TA ČR
  • Významné projekty
  • Projekty s nejvyšší státní podporou
  • Aktuálně běžící projekty

Chytré vyhledávání

  • Takto najdu konkrétní +slovo
  • Takto z výsledků -slovo zcela vynechám
  • “Takto můžu najít celou frázi”

The issues of facility management using bim in Czech Republic

Identifikátory výsledku

  • Kód výsledku v IS VaVaI

    <a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F61989100%3A27120%2F20%3A10246751" target="_blank" >RIV/61989100:27120/20:10246751 - isvavai.cz</a>

  • Výsledek na webu

    <a href="https://www.sgem.org/index.php/component/jresearch/?view=publication&task=show&id=7473&Itemid=" target="_blank" >https://www.sgem.org/index.php/component/jresearch/?view=publication&task=show&id=7473&Itemid=</a>

  • DOI - Digital Object Identifier

    <a href="http://dx.doi.org/10.5593/sgem2020/5.2/s21.076" target="_blank" >10.5593/sgem2020/5.2/s21.076</a>

Alternativní jazyky

  • Jazyk výsledku

    angličtina

  • Název v původním jazyce

    The issues of facility management using bim in Czech Republic

  • Popis výsledku v původním jazyce

    Currently in the field of BIM design, the Czech Republic is in many ways behind compared to other countries. In countries in which this method is long established, it makes a significant contribution to improving the economic and environmental efficiency of buildings in all life cycles of construction. The BIM method can save construction costs and conserve the environment, by appropriate design of technical and technological equipment, as early as the preliminary stage of a project, but also when building is carried out. It is conceivable that the highest economic advantage of the construction, designed by the BIM method, will manifest itself in its longest life phase, at the time of operation and use of the property. From 2022, all over-limit public contracts, in the Czech Republic, will have to be processed using the BIM method. So 2022 can be seen as a landmark year in our country in the construction sector, so this issue is very timely. There are several reasons for the obligation to introduce BIM when designing buildings. The main reason is the possibility of collision detection and prevention of collisions on the construction site, which is a very common problem in our country. Furthermore, more accurate planning, and above all the highest possible efficiency of construction costs and setting up the property so that it is environmentally friendly during operation and use, this phase is the most expensive in terms of construction life. The BIM method should therefore significantly benefit the construction industry in the Czech Republic, yet in some cases the professional public is lax about it, or even rejects it due to ignorance. The change in the view of the lay and professional public on the method of designing and operating the building using the BIM method is the reason for processing this article.

  • Název v anglickém jazyce

    The issues of facility management using bim in Czech Republic

  • Popis výsledku anglicky

    Currently in the field of BIM design, the Czech Republic is in many ways behind compared to other countries. In countries in which this method is long established, it makes a significant contribution to improving the economic and environmental efficiency of buildings in all life cycles of construction. The BIM method can save construction costs and conserve the environment, by appropriate design of technical and technological equipment, as early as the preliminary stage of a project, but also when building is carried out. It is conceivable that the highest economic advantage of the construction, designed by the BIM method, will manifest itself in its longest life phase, at the time of operation and use of the property. From 2022, all over-limit public contracts, in the Czech Republic, will have to be processed using the BIM method. So 2022 can be seen as a landmark year in our country in the construction sector, so this issue is very timely. There are several reasons for the obligation to introduce BIM when designing buildings. The main reason is the possibility of collision detection and prevention of collisions on the construction site, which is a very common problem in our country. Furthermore, more accurate planning, and above all the highest possible efficiency of construction costs and setting up the property so that it is environmentally friendly during operation and use, this phase is the most expensive in terms of construction life. The BIM method should therefore significantly benefit the construction industry in the Czech Republic, yet in some cases the professional public is lax about it, or even rejects it due to ignorance. The change in the view of the lay and professional public on the method of designing and operating the building using the BIM method is the reason for processing this article.

Klasifikace

  • Druh

    D - Stať ve sborníku

  • CEP obor

  • OECD FORD obor

    20100 - Civil engineering

Návaznosti výsledku

  • Projekt

  • Návaznosti

    S - Specificky vyzkum na vysokych skolach

Ostatní

  • Rok uplatnění

    2020

  • Kód důvěrnosti údajů

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

Údaje specifické pro druh výsledku

  • Název statě ve sborníku

    20th International Multidisciplinary Scientific GeoConference : SGEM 2020 : conference proceedings : 18-24 August, 2020, Albena, Bulgaria. Issue 6.1

  • ISBN

    978-619-7603-12-5

  • ISSN

    1314-2704

  • e-ISSN

    1314-2704

  • Počet stran výsledku

    8

  • Strana od-do

    619-626

  • Název nakladatele

    STEF92 Technology Ltd.

  • Místo vydání

    Sofia

  • Místo konání akce

    Albena

  • Datum konání akce

    18. 8. 2020

  • Typ akce podle státní příslušnosti

    WRD - Celosvětová akce

  • Kód UT WoS článku