Construction Process Duration Predicted by Statistical Method
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F61989100%3A27120%2F21%3A10248342" target="_blank" >RIV/61989100:27120/21:10248342 - isvavai.cz</a>
Výsledek na webu
<a href="https://iopscience.iop.org/article/10.1088/1757-899X/1203/3/032135/pdf" target="_blank" >https://iopscience.iop.org/article/10.1088/1757-899X/1203/3/032135/pdf</a>
DOI - Digital Object Identifier
<a href="http://dx.doi.org/10.1088/1757-899X/1203/3/032135" target="_blank" >10.1088/1757-899X/1203/3/032135</a>
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Construction Process Duration Predicted by Statistical Method
Popis výsledku v původním jazyce
any construction projects today are planned and managed using computer technology. An integral part of the management of these projects is sophisticated software, which includes statistical probabilistic methods. The main task in this area is direct verification of the validity of planned labour productivity values during the construction process according to the recorded average performance values. Using selected statistical methods and analyses, a case study can document this type of undertaking, for example, in a selected masonry process in which the upper and lower limits of performance, i.e. the optimistic and pessimistic bounds, may be calculated with 95% probability. Evaluation of these performance parameters in the construction software used for this study showed a difference in time of 11 days at the end of the process. The figures indicated a 9.6% and 14.3% decrease in labour productivity, respectively, for the optimistic and pessimistic values compared to the construction software's planned values. Repeated evaluation of performance can aid in improving labour productivity and attaining project milestones and subsequent construction deadlines during the construction process. This paper aims to confirm or refute this theoretical balance using probabilistic statistical methods and to emphasize the importance of statistical analysis in the real construction process with the use of the software.
Název v anglickém jazyce
Construction Process Duration Predicted by Statistical Method
Popis výsledku anglicky
any construction projects today are planned and managed using computer technology. An integral part of the management of these projects is sophisticated software, which includes statistical probabilistic methods. The main task in this area is direct verification of the validity of planned labour productivity values during the construction process according to the recorded average performance values. Using selected statistical methods and analyses, a case study can document this type of undertaking, for example, in a selected masonry process in which the upper and lower limits of performance, i.e. the optimistic and pessimistic bounds, may be calculated with 95% probability. Evaluation of these performance parameters in the construction software used for this study showed a difference in time of 11 days at the end of the process. The figures indicated a 9.6% and 14.3% decrease in labour productivity, respectively, for the optimistic and pessimistic values compared to the construction software's planned values. Repeated evaluation of performance can aid in improving labour productivity and attaining project milestones and subsequent construction deadlines during the construction process. This paper aims to confirm or refute this theoretical balance using probabilistic statistical methods and to emphasize the importance of statistical analysis in the real construction process with the use of the software.
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
—
OECD FORD obor
20101 - Civil engineering
Návaznosti výsledku
Projekt
—
Návaznosti
I - Institucionalni podpora na dlouhodoby koncepcni rozvoj vyzkumne organizace
Ostatní
Rok uplatnění
2021
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
IOP Conference Series: Materials Science and Engineering. Volume 1203
ISBN
—
ISSN
1757-8981
e-ISSN
1757-899X
Počet stran výsledku
18
Strana od-do
1-18
Název nakladatele
IOP Publishing
Místo vydání
Bristol
Místo konání akce
Praha
Datum konání akce
14. 6. 2021
Typ akce podle státní příslušnosti
WRD - Celosvětová akce
Kód UT WoS článku
—