Correlation between surface concentration of chloride ions and chloride deposition rate in concrete
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F61989100%3A27120%2F22%3A10248742" target="_blank" >RIV/61989100:27120/22:10248742 - isvavai.cz</a>
Nalezeny alternativní kódy
RIV/00216305:26110/22:PU143468
Výsledek na webu
<a href="https://doi.org/10.1016/j.conbuildmat.2021.126183" target="_blank" >https://doi.org/10.1016/j.conbuildmat.2021.126183</a>
DOI - Digital Object Identifier
<a href="http://dx.doi.org/10.1016/j.conbuildmat.2021.126183" target="_blank" >10.1016/j.conbuildmat.2021.126183</a>
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Correlation between surface concentration of chloride ions and chloride deposition rate in concrete
Popis výsledku v původním jazyce
This paper analyses the correlation function between the results of the time-consuming evaluation of chloride in concrete using the modified chloride penetration test and the significantly faster evaluation of the amount of chloride in the air using the dry plate method. Two in-situ locations in the Czech Republic were selected for longterm placement of samples, each with a highly different microclimate related to traffic intensity and different types of a bridge structure. Concrete samples were placed in-situ for 0.5, 1, 1.5, and 2 years of exposure. The dry plate method for obtaining the deposition rate of chloride was analysed each month and recalculated to the chlorides captured on the surface of the plate. There was good agreement in the amount of chloride increase in concrete and deposition plate during the winter, the increase of chlorides from de-icing agents, as well as a decrease in the summer period. In the measurements of concrete, the effect of chloride leaching from the upper layers was observed, even though the samples were partially hidden. The correlation found thus far needs to be verified in other locations in situ thus clarifying whether the dry plate method can fully replace the destructive examination of concrete structures.
Název v anglickém jazyce
Correlation between surface concentration of chloride ions and chloride deposition rate in concrete
Popis výsledku anglicky
This paper analyses the correlation function between the results of the time-consuming evaluation of chloride in concrete using the modified chloride penetration test and the significantly faster evaluation of the amount of chloride in the air using the dry plate method. Two in-situ locations in the Czech Republic were selected for longterm placement of samples, each with a highly different microclimate related to traffic intensity and different types of a bridge structure. Concrete samples were placed in-situ for 0.5, 1, 1.5, and 2 years of exposure. The dry plate method for obtaining the deposition rate of chloride was analysed each month and recalculated to the chlorides captured on the surface of the plate. There was good agreement in the amount of chloride increase in concrete and deposition plate during the winter, the increase of chlorides from de-icing agents, as well as a decrease in the summer period. In the measurements of concrete, the effect of chloride leaching from the upper layers was observed, even though the samples were partially hidden. The correlation found thus far needs to be verified in other locations in situ thus clarifying whether the dry plate method can fully replace the destructive examination of concrete structures.
Klasifikace
Druh
J<sub>imp</sub> - Článek v periodiku v databázi Web of Science
CEP obor
—
OECD FORD obor
20102 - Construction engineering, Municipal and structural engineering
Návaznosti výsledku
Projekt
<a href="/cs/project/GA18-07949S" target="_blank" >GA18-07949S: Pravděpodobnostní modelování trvanlivosti železobetonových konstrukcí s uvážením spolupůsobení karbonatace, chloridů a mechanického zatížení</a><br>
Návaznosti
P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)
Ostatní
Rok uplatnění
2022
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název periodika
Construction and Building Materials
ISSN
0950-0618
e-ISSN
1879-0526
Svazek periodika
320
Číslo periodika v rámci svazku
320
Stát vydavatele periodika
US - Spojené státy americké
Počet stran výsledku
11
Strana od-do
nestrankovano
Kód UT WoS článku
000740114900001
EID výsledku v databázi Scopus
—