Electricity Production and Transmission Facilities Assessment as Part of Critical Infrastructure Protection
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F61989100%3A27200%2F12%3A86082611" target="_blank" >RIV/61989100:27200/12:86082611 - isvavai.cz</a>
Výsledek na webu
—
DOI - Digital Object Identifier
—
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Electricity Production and Transmission Facilities Assessment as Part of Critical Infrastructure Protection
Popis výsledku v původním jazyce
The article deals with risk assessment of the electricity production and transmission facilities. The introduction emphasizes the importance of these facilities in the area of critical infrastructure and the need for permanent assessment of all potentialrisks. The contribution mainstay is a proposal of a step algorithm for the electricity production and transmission facilities threats and risks objectification which consists of several successive steps continual-ly executed in three phases. The first phase is concentrated on the critical infrastructure elements categorization by cross-sectional criteria, the second one on determining the electricity production and transmission facilities risks and their prioritization and, within the third phase, thecritical infrastructure individual elements are sorted into appropriate levels of physical protection.
Název v anglickém jazyce
Electricity Production and Transmission Facilities Assessment as Part of Critical Infrastructure Protection
Popis výsledku anglicky
The article deals with risk assessment of the electricity production and transmission facilities. The introduction emphasizes the importance of these facilities in the area of critical infrastructure and the need for permanent assessment of all potentialrisks. The contribution mainstay is a proposal of a step algorithm for the electricity production and transmission facilities threats and risks objectification which consists of several successive steps continual-ly executed in three phases. The first phase is concentrated on the critical infrastructure elements categorization by cross-sectional criteria, the second one on determining the electricity production and transmission facilities risks and their prioritization and, within the third phase, thecritical infrastructure individual elements are sorted into appropriate levels of physical protection.
Klasifikace
Druh
J<sub>x</sub> - Nezařazeno - Článek v odborném periodiku (Jimp, Jsc a Jost)
CEP obor
AQ - Bezpečnost a ochrana zdraví, člověk – stroj
OECD FORD obor
—
Návaznosti výsledku
Projekt
<a href="/cs/project/VF20112013019" target="_blank" >VF20112013019: Objektivizace hrozeb a rizik zařízení pro výrobu a přenos elektřiny</a><br>
Návaznosti
P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)
Ostatní
Rok uplatnění
2012
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název periodika
Economics and Management
ISSN
1802-3975
e-ISSN
—
Svazek periodika
2012
Číslo periodika v rámci svazku
2
Stát vydavatele periodika
CZ - Česká republika
Počet stran výsledku
9
Strana od-do
80-88
Kód UT WoS článku
—
EID výsledku v databázi Scopus
—