Issues Concerning the Operation of 110 kV Power Lines
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F61989100%3A27240%2F10%3A86075600" target="_blank" >RIV/61989100:27240/10:86075600 - isvavai.cz</a>
Výsledek na webu
—
DOI - Digital Object Identifier
—
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Issues Concerning the Operation of 110 kV Power Lines
Popis výsledku v původním jazyce
The paper deals with issues concerning the operation of 110 kV power lines with respect to the occurrence of failures and faults. The second part analyses the failure database of 110 kV power lines and includes graphs which illustrate the most common failure types and their causes. The third part deals with the analysis of a database of the faults on 110 kV power lines, showing the most common causes of faults and specific types of faults. In the fourth part, the power line with the largest number of faults, which was planned to be completely reconstructed, is selected. In the fifth part a more intensive maintenance for all 110 kV power lines is proposed and finally, in the last part, the cost per km of power line is estimated taking into account the current situation and the new design (after the reconstruction of three power lines and intensified maintenance) with respect to the whole 110 kV power grid.
Název v anglickém jazyce
Issues Concerning the Operation of 110 kV Power Lines
Popis výsledku anglicky
The paper deals with issues concerning the operation of 110 kV power lines with respect to the occurrence of failures and faults. The second part analyses the failure database of 110 kV power lines and includes graphs which illustrate the most common failure types and their causes. The third part deals with the analysis of a database of the faults on 110 kV power lines, showing the most common causes of faults and specific types of faults. In the fourth part, the power line with the largest number of faults, which was planned to be completely reconstructed, is selected. In the fifth part a more intensive maintenance for all 110 kV power lines is proposed and finally, in the last part, the cost per km of power line is estimated taking into account the current situation and the new design (after the reconstruction of three power lines and intensified maintenance) with respect to the whole 110 kV power grid.
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
JE - Nejaderná energetika, spotřeba a užití energie
OECD FORD obor
—
Návaznosti výsledku
Projekt
<a href="/cs/project/GA102%2F09%2F1842" target="_blank" >GA102/09/1842: Spolehlivá elektroenergetická soustava s připojenými netradičními zdroji</a><br>
Návaznosti
P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)
Ostatní
Rok uplatnění
2010
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
Proceedings of the 7th Workshop ELNET 2010
ISBN
978-80-248-2349-2
ISSN
—
e-ISSN
—
Počet stran výsledku
9
Strana od-do
—
Název nakladatele
VŠB-TU Ostrava
Místo vydání
Ostrava
Místo konání akce
Ostrava
Datum konání akce
30. 11. 2010
Typ akce podle státní příslušnosti
WRD - Celosvětová akce
Kód UT WoS článku
—