The Utilization of Ground Source Heat Pumps (GSHP) for Research Purpose in the Campus of VSB - Technical University of Ostrava
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F61989100%3A27240%2F14%3A86090071" target="_blank" >RIV/61989100:27240/14:86090071 - isvavai.cz</a>
Nalezeny alternativní kódy
RIV/61989100:27350/14:86090071
Výsledek na webu
<a href="http://dx.doi.org/10.4028/www.scientific.net/AMR.1020.507" target="_blank" >http://dx.doi.org/10.4028/www.scientific.net/AMR.1020.507</a>
DOI - Digital Object Identifier
<a href="http://dx.doi.org/10.4028/www.scientific.net/AMR.1020.507" target="_blank" >10.4028/www.scientific.net/AMR.1020.507</a>
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
The Utilization of Ground Source Heat Pumps (GSHP) for Research Purpose in the Campus of VSB - Technical University of Ostrava
Popis výsledku v původním jazyce
The largest been realized installations of heat pumps in the Czech Republic, where the primary collector of low-potential heat is formed deep wells, is heating complex building of new Auditorium and CIT in campus of VSB - Technical University of Ostrava.This building represents two independent functional units (Auditorium with side halls and Information Technology Centre - CIT) with a total floor area of 9234 m2. The original project planned compound heating using district heating as a primary source of heat. Heating the object itself is a combination of floor heating systems and hot-air heaters. During project preparation has changed the project heating and a modern, technically unique and highly cost-effective solution has been designed with heat pump (type rock-water). Currently building heats 10 heat pumps with a total output of 700 kW through 110 wells with a depth of 130 m each. To assess the proportions of individual internal and external sources to the overall heat balance, th
Název v anglickém jazyce
The Utilization of Ground Source Heat Pumps (GSHP) for Research Purpose in the Campus of VSB - Technical University of Ostrava
Popis výsledku anglicky
The largest been realized installations of heat pumps in the Czech Republic, where the primary collector of low-potential heat is formed deep wells, is heating complex building of new Auditorium and CIT in campus of VSB - Technical University of Ostrava.This building represents two independent functional units (Auditorium with side halls and Information Technology Centre - CIT) with a total floor area of 9234 m2. The original project planned compound heating using district heating as a primary source of heat. Heating the object itself is a combination of floor heating systems and hot-air heaters. During project preparation has changed the project heating and a modern, technically unique and highly cost-effective solution has been designed with heat pump (type rock-water). Currently building heats 10 heat pumps with a total output of 700 kW through 110 wells with a depth of 130 m each. To assess the proportions of individual internal and external sources to the overall heat balance, th
Klasifikace
Druh
J<sub>x</sub> - Nezařazeno - Článek v odborném periodiku (Jimp, Jsc a Jost)
CEP obor
DH - Báňský průmysl včetně těžby a zpracování uhlí
OECD FORD obor
—
Návaznosti výsledku
Projekt
Výsledek vznikl pri realizaci vícero projektů. Více informací v záložce Projekty.
Návaznosti
P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)
Ostatní
Rok uplatnění
2014
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název periodika
Advanced Materials Research. Volume 1020
ISSN
1022-6680
e-ISSN
—
Svazek periodika
1020
Číslo periodika v rámci svazku
1020
Stát vydavatele periodika
CH - Švýcarská konfederace
Počet stran výsledku
6
Strana od-do
507 - 512