The Solution Of Remediation Of Chemical Uranium Mining Consequences In The Czech Republic
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F61989100%3A27350%2F11%3A86078141" target="_blank" >RIV/61989100:27350/11:86078141 - isvavai.cz</a>
Výsledek na webu
<a href="http://dx.doi.org/10.5593/SGEM2011/S03.148" target="_blank" >http://dx.doi.org/10.5593/SGEM2011/S03.148</a>
DOI - Digital Object Identifier
<a href="http://dx.doi.org/10.5593/SGEM2011/S03.148" target="_blank" >10.5593/SGEM2011/S03.148</a>
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
The Solution Of Remediation Of Chemical Uranium Mining Consequences In The Czech Republic
Popis výsledku v původním jazyce
Contribution notifies of the variant solutions of the recovery of consequences of chemical uranium mining in the CR in the Straz pod Ralskem region. Remediation is realized by a state company DIAMO. In the chemical extraction period over four million tons of sulfuric acid and other chemicals were injected into the ground, whereas approximately 370 million cubic meters of groundwater were contaminated. Currently, the contaminated water is pumped from the underground to the surface and it leads to liquidation of contaminants, or economically useful products are produced. The article reports on two versions of a procedure for the rehabilitation and settlement of damage. For the first (advantageous) variant, the remediation objectives will be achieved in 2032, then the operating costs of rehabilitation and liquidation of consequences of uranium mining in the area of the Stráž pod Ralskem will be CZK 32,527 billion (euro 1,348 billion) and the investment cost will be of CZK 1,485 billion (e
Název v anglickém jazyce
The Solution Of Remediation Of Chemical Uranium Mining Consequences In The Czech Republic
Popis výsledku anglicky
Contribution notifies of the variant solutions of the recovery of consequences of chemical uranium mining in the CR in the Straz pod Ralskem region. Remediation is realized by a state company DIAMO. In the chemical extraction period over four million tons of sulfuric acid and other chemicals were injected into the ground, whereas approximately 370 million cubic meters of groundwater were contaminated. Currently, the contaminated water is pumped from the underground to the surface and it leads to liquidation of contaminants, or economically useful products are produced. The article reports on two versions of a procedure for the rehabilitation and settlement of damage. For the first (advantageous) variant, the remediation objectives will be achieved in 2032, then the operating costs of rehabilitation and liquidation of consequences of uranium mining in the area of the Stráž pod Ralskem will be CZK 32,527 billion (euro 1,348 billion) and the investment cost will be of CZK 1,485 billion (e
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
DH - Báňský průmysl včetně těžby a zpracování uhlí
OECD FORD obor
—
Návaznosti výsledku
Projekt
<a href="/cs/project/AACBU42-05" target="_blank" >AACBU42-05: Likvidace hlubinného dolu zakládáním po ukončení báňské činnosti pro snížení bezpečnostních a ekologických rizik</a><br>
Návaznosti
P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)
Ostatní
Rok uplatnění
2011
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
11th International Multidisciplinary Scientific GeoConference SGEM 2011 (1.-3. díl)
ISBN
—
ISSN
1314-2704
e-ISSN
—
Počet stran výsledku
8
Strana od-do
1011-1018
Název nakladatele
STEF92 Technology Ltd.
Místo vydání
Sofia
Místo konání akce
Albena, Varna
Datum konání akce
20. 6. 2011
Typ akce podle státní příslušnosti
WRD - Celosvětová akce
Kód UT WoS článku
000307366000135