The management of mine waste from mining and treatment of granite for crude stone production
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F61989100%3A27350%2F12%3A86082465" target="_blank" >RIV/61989100:27350/12:86082465 - isvavai.cz</a>
Výsledek na webu
<a href="http://dx.doi.org/10.5593/SGEM2012/S03.V1067" target="_blank" >http://dx.doi.org/10.5593/SGEM2012/S03.V1067</a>
DOI - Digital Object Identifier
<a href="http://dx.doi.org/10.5593/SGEM2012/S03.V1067" target="_blank" >10.5593/SGEM2012/S03.V1067</a>
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
The management of mine waste from mining and treatment of granite for crude stone production
Popis výsledku v původním jazyce
The treatment of granite blocks for the crude stone production produces a high percentage of waste, especially a shape unsuitable pieces and spalls of stone. In some cases, up to half of mined materials deposited on the dump pile, which is a great burdento the environment for example large claim of land, changing the landscape relief, etc. It is also necessary to mention the economic burden on mining companies and ultimately the legal obligation to use mineral wealth efficiently. Therefore is necessaryto use again dump pile materials. By using the waste becomes secondary raw material. Dump piles are not treated as waste material, but as deposits minerals. This paper summarizes the proposal of suitable domp pile mining in working districts Žulová in the Czech Republic. This is influenced by the physic-mechanical properties of materials deposit on the dump pile, which is made up of different lumpiness overburden materials, dirt bands and waste from crude stone production. Extracted mat
Název v anglickém jazyce
The management of mine waste from mining and treatment of granite for crude stone production
Popis výsledku anglicky
The treatment of granite blocks for the crude stone production produces a high percentage of waste, especially a shape unsuitable pieces and spalls of stone. In some cases, up to half of mined materials deposited on the dump pile, which is a great burdento the environment for example large claim of land, changing the landscape relief, etc. It is also necessary to mention the economic burden on mining companies and ultimately the legal obligation to use mineral wealth efficiently. Therefore is necessaryto use again dump pile materials. By using the waste becomes secondary raw material. Dump piles are not treated as waste material, but as deposits minerals. This paper summarizes the proposal of suitable domp pile mining in working districts Žulová in the Czech Republic. This is influenced by the physic-mechanical properties of materials deposit on the dump pile, which is made up of different lumpiness overburden materials, dirt bands and waste from crude stone production. Extracted mat
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
DH - Báňský průmysl včetně těžby a zpracování uhlí
OECD FORD obor
—
Návaznosti výsledku
Projekt
—
Návaznosti
S - Specificky vyzkum na vysokych skolach
Ostatní
Rok uplatnění
2012
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
12th International Multidisciplinary Scientific GeoConference SGEM 2012 : conference proceedings. Volume I-V
ISBN
—
ISSN
1314-2704
e-ISSN
—
Počet stran výsledku
6
Strana od-do
"899;904"
Název nakladatele
STEF92 Technology Ltd.
Místo vydání
Sofia
Místo konání akce
Albena
Datum konání akce
17. 6. 2012
Typ akce podle státní příslušnosti
WRD - Celosvětová akce
Kód UT WoS článku
000348530900115