REPLACING CONTINUOUS-OPERATION TRANSPORT EQUIPMENT WITH WHEELED VEHICLES
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F61989100%3A27350%2F12%3A86082496" target="_blank" >RIV/61989100:27350/12:86082496 - isvavai.cz</a>
Výsledek na webu
<a href="http://dx.doi.org/10.5593/sgem2012/s03.v1049" target="_blank" >http://dx.doi.org/10.5593/sgem2012/s03.v1049</a>
DOI - Digital Object Identifier
<a href="http://dx.doi.org/10.5593/sgem2012/s03.v1049" target="_blank" >10.5593/sgem2012/s03.v1049</a>
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
REPLACING CONTINUOUS-OPERATION TRANSPORT EQUIPMENT WITH WHEELED VEHICLES
Popis výsledku v původním jazyce
The article discusses the replacement of continuous -operation transport equipment with discontinuous-operation equipment. This basically means a change of the concept of extraction from an active surface mine (open-pit mine), whereby TCII series continuous-operation equipment on the working levels on 3 overburden benches on the worked front will be replaced with discontinuous-operation equipment having the required capacity as part of overburden stripping for reclamation. This causes a different distribution of the working levels on each of the overburden benches, which currently include the protective zone at the foot of each of the overburden bench, where the security zone needs to be preserved, the working level with the extraction plant itself, and lines ensuring safe operation. The change of technology results in a different structure of the layers and grading of each of the working stopes while preserving the required general slope of the pit. The article also describes the appr
Název v anglickém jazyce
REPLACING CONTINUOUS-OPERATION TRANSPORT EQUIPMENT WITH WHEELED VEHICLES
Popis výsledku anglicky
The article discusses the replacement of continuous -operation transport equipment with discontinuous-operation equipment. This basically means a change of the concept of extraction from an active surface mine (open-pit mine), whereby TCII series continuous-operation equipment on the working levels on 3 overburden benches on the worked front will be replaced with discontinuous-operation equipment having the required capacity as part of overburden stripping for reclamation. This causes a different distribution of the working levels on each of the overburden benches, which currently include the protective zone at the foot of each of the overburden bench, where the security zone needs to be preserved, the working level with the extraction plant itself, and lines ensuring safe operation. The change of technology results in a different structure of the layers and grading of each of the working stopes while preserving the required general slope of the pit. The article also describes the appr
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
DH - Báňský průmysl včetně těžby a zpracování uhlí
OECD FORD obor
—
Návaznosti výsledku
Projekt
—
Návaznosti
V - Vyzkumna aktivita podporovana z jinych verejnych zdroju
Ostatní
Rok uplatnění
2012
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
12th International Multidisciplinary Scientific GeoConference SGEM 2012 : conference proceedings. Volume I-V
ISBN
—
ISSN
1314-2704
e-ISSN
—
Počet stran výsledku
5
Strana od-do
771-775
Název nakladatele
STEF92 Technology Ltd.
Místo vydání
Sofia
Místo konání akce
Albena
Datum konání akce
17. 6. 2012
Typ akce podle státní příslušnosti
WRD - Celosvětová akce
Kód UT WoS článku
—