Connecting Surveys and Orientation Measurements in Čsa 2 and Mír 5 Shafts
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F61989100%3A27350%2F14%3A86091631" target="_blank" >RIV/61989100:27350/14:86091631 - isvavai.cz</a>
Výsledek na webu
<a href="http://www.potopk.com.pl/Full_text/2014_full/2014_1_09.pdf" target="_blank" >http://www.potopk.com.pl/Full_text/2014_full/2014_1_09.pdf</a>
DOI - Digital Object Identifier
—
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Connecting Surveys and Orientation Measurements in Čsa 2 and Mír 5 Shafts
Popis výsledku v původním jazyce
Connecting surveys and orientation measurements in the ČSA 2 and Mír 5 shafts were carried out in order to determine their positions in relation to each other and the positions of these two underground mining works in relation to structures situated on the surface. The measurements were carried out during the completion of the connecting underground crosscut between the Karviná and Darkov Mines, with an anticipated length of 3,100 metres. This is a very complex issue involving the most precise measurement and calculation techniques in mine surveying, especially as to achieving the necessary accuracy, which is mostly defined by the longitudinal and transverse deviations of the ?cut-through? or ?breakthrough?. The project engineer determined the requiredaccuracy as a maximum deviation (longitudinal, transverse) of 0.250 metres for all cut-through options (special accuracy). The entire measurement process included surface measurements, depth measurements of both connected horizons (Mír 5
Název v anglickém jazyce
Connecting Surveys and Orientation Measurements in Čsa 2 and Mír 5 Shafts
Popis výsledku anglicky
Connecting surveys and orientation measurements in the ČSA 2 and Mír 5 shafts were carried out in order to determine their positions in relation to each other and the positions of these two underground mining works in relation to structures situated on the surface. The measurements were carried out during the completion of the connecting underground crosscut between the Karviná and Darkov Mines, with an anticipated length of 3,100 metres. This is a very complex issue involving the most precise measurement and calculation techniques in mine surveying, especially as to achieving the necessary accuracy, which is mostly defined by the longitudinal and transverse deviations of the ?cut-through? or ?breakthrough?. The project engineer determined the requiredaccuracy as a maximum deviation (longitudinal, transverse) of 0.250 metres for all cut-through options (special accuracy). The entire measurement process included surface measurements, depth measurements of both connected horizons (Mír 5
Klasifikace
Druh
J<sub>x</sub> - Nezařazeno - Článek v odborném periodiku (Jimp, Jsc a Jost)
CEP obor
DH - Báňský průmysl včetně těžby a zpracování uhlí
OECD FORD obor
—
Návaznosti výsledku
Projekt
—
Návaznosti
N - Vyzkumna aktivita podporovana z neverejnych zdroju
Ostatní
Rok uplatnění
2014
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název periodika
Inžynieria Mineralna
ISSN
1640-4920
e-ISSN
—
Svazek periodika
33
Číslo periodika v rámci svazku
1/2014
Stát vydavatele periodika
PL - Polská republika
Počet stran výsledku
8
Strana od-do
69-76
Kód UT WoS článku
—
EID výsledku v databázi Scopus
—