Completion and utilization of the rehabilitated central tailing heap of jan Šverma mine in Žacléř
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F61989100%3A27350%2F16%3A86100033" target="_blank" >RIV/61989100:27350/16:86100033 - isvavai.cz</a>
Výsledek na webu
—
DOI - Digital Object Identifier
—
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Completion and utilization of the rehabilitated central tailing heap of jan Šverma mine in Žacléř
Popis výsledku v původním jazyce
In the article, the authors focus on the continuation of restoration and rehabilitation in the west part of the Central Heap and on the completion of rehabilitation work on the Central Heap, which is connected with the evaluation of subsequent use of rehabilitated land. In [1][2], the results of the first stage of restoration and rehabilitation of the Central Heap of the Jan Šverma Mine in Žacléř with the climax in the year 2009, when 11 hectares of total 18 hectares were grassed down, were already presented. This introductory part was followed by other rehabilitation works focused on reshaping the Heap to create stable slopes with safe slope conditions. Earthworks are described. In connection with the earthworks in the framework of ground shaping, a drainage system was completed and the whole area of interest was grassed; increased attention being paid to adequate irrigation. The utilization of the rehabilitated Central Heap after the completion of rehabilitation by hydroseeding and after the rest period was described.
Název v anglickém jazyce
Completion and utilization of the rehabilitated central tailing heap of jan Šverma mine in Žacléř
Popis výsledku anglicky
In the article, the authors focus on the continuation of restoration and rehabilitation in the west part of the Central Heap and on the completion of rehabilitation work on the Central Heap, which is connected with the evaluation of subsequent use of rehabilitated land. In [1][2], the results of the first stage of restoration and rehabilitation of the Central Heap of the Jan Šverma Mine in Žacléř with the climax in the year 2009, when 11 hectares of total 18 hectares were grassed down, were already presented. This introductory part was followed by other rehabilitation works focused on reshaping the Heap to create stable slopes with safe slope conditions. Earthworks are described. In connection with the earthworks in the framework of ground shaping, a drainage system was completed and the whole area of interest was grassed; increased attention being paid to adequate irrigation. The utilization of the rehabilitated Central Heap after the completion of rehabilitation by hydroseeding and after the rest period was described.
Klasifikace
Druh
J<sub>x</sub> - Nezařazeno - Článek v odborném periodiku (Jimp, Jsc a Jost)
CEP obor
DH - Báňský průmysl včetně těžby a zpracování uhlí
OECD FORD obor
—
Návaznosti výsledku
Projekt
—
Návaznosti
N - Vyzkumna aktivita podporovana z neverejnych zdroju
Ostatní
Rok uplatnění
2016
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název periodika
Inžynieria Mineralna
ISSN
1640-4920
e-ISSN
—
Svazek periodika
17
Číslo periodika v rámci svazku
1
Stát vydavatele periodika
PL - Polská republika
Počet stran výsledku
9
Strana od-do
153-161
Kód UT WoS článku
—
EID výsledku v databázi Scopus
2-s2.0-84997541713