A SURVEY OF SPATIAL POSITION FOR TRACK SECTION POVAŽSKÁ TEPLÁ – ŽILINA
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F61989100%3A27350%2F17%3A10235978" target="_blank" >RIV/61989100:27350/17:10235978 - isvavai.cz</a>
Výsledek na webu
<a href="http://dx.doi.org/10.5593/sgem2017/22/S09.004" target="_blank" >http://dx.doi.org/10.5593/sgem2017/22/S09.004</a>
DOI - Digital Object Identifier
<a href="http://dx.doi.org/10.5593/sgem2017/22/S09.004" target="_blank" >10.5593/sgem2017/22/S09.004</a>
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
A SURVEY OF SPATIAL POSITION FOR TRACK SECTION POVAŽSKÁ TEPLÁ – ŽILINA
Popis výsledku v původním jazyce
This article deals with the spatial position of tracks surveying using a measuring truck and automatic total station. At the beginning of work it was necessary to gain theoretical knowledge on geodetic activities carried out in the process of reconstruction works on the track surface, and to define the concept of the geometric position of the track. Collecting necessary design documentation is an essential part of the whole measuring process. Adherence to the specified accuracies and deviations in the Slovak Technical Standard (hereinafter referred to as STS) is an important part of measurement. By choosing an appropriate method of measurement and instrumentation a data file has been compiled, which was subsequently processed using the program Rail. From these measured values, displayed in graphical and computer programs, we have obtained a graphical illustration of the track position before the definite and after definite posting, i.e. a graphic representation of tracks before and after. Track shall be carried out using automatic ballast tampers, stabilizers and mount plows for ballast beds.
Název v anglickém jazyce
A SURVEY OF SPATIAL POSITION FOR TRACK SECTION POVAŽSKÁ TEPLÁ – ŽILINA
Popis výsledku anglicky
This article deals with the spatial position of tracks surveying using a measuring truck and automatic total station. At the beginning of work it was necessary to gain theoretical knowledge on geodetic activities carried out in the process of reconstruction works on the track surface, and to define the concept of the geometric position of the track. Collecting necessary design documentation is an essential part of the whole measuring process. Adherence to the specified accuracies and deviations in the Slovak Technical Standard (hereinafter referred to as STS) is an important part of measurement. By choosing an appropriate method of measurement and instrumentation a data file has been compiled, which was subsequently processed using the program Rail. From these measured values, displayed in graphical and computer programs, we have obtained a graphical illustration of the track position before the definite and after definite posting, i.e. a graphic representation of tracks before and after. Track shall be carried out using automatic ballast tampers, stabilizers and mount plows for ballast beds.
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
—
OECD FORD obor
20703 - Mining and mineral processing
Návaznosti výsledku
Projekt
<a href="/cs/project/LO1406" target="_blank" >LO1406: Institut čistých technologií těžby a užití energetických surovin - Projekt udržitelnosti</a><br>
Návaznosti
P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)
Ostatní
Rok uplatnění
2017
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
17th International Multidisciplinary Scientific GeoConference: SGEM 2017 : conference proceedings : 29 June-5 July, 2017, Albena, Bulgaria. Volume 17. Issue 22
ISBN
978-619-7408-02-7
ISSN
1314-2704
e-ISSN
neuvedeno
Počet stran výsledku
7
Strana od-do
27-34
Název nakladatele
STEF92 Technology Ltd.
Místo vydání
Sofia
Místo konání akce
Albena
Datum konání akce
29. 6. 2017
Typ akce podle státní příslušnosti
WRD - Celosvětová akce
Kód UT WoS článku
—