A Proposal of Rock Burst Control Measures at the Coalface No. 1 4064 at the Mining Plant 1, in OKD, A. S. Czech Republic
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F61989100%3A27350%2F20%3A10245415" target="_blank" >RIV/61989100:27350/20:10245415 - isvavai.cz</a>
Výsledek na webu
<a href="https://inzynieriamineralna.com.pl/index.php/testowe/article/view/19" target="_blank" >https://inzynieriamineralna.com.pl/index.php/testowe/article/view/19</a>
DOI - Digital Object Identifier
<a href="http://dx.doi.org/10.29227/IM-2020-01-17" target="_blank" >10.29227/IM-2020-01-17</a>
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
A Proposal of Rock Burst Control Measures at the Coalface No. 1 4064 at the Mining Plant 1, in OKD, A. S. Czech Republic
Popis výsledku v původním jazyce
The paper describes a proposal of rock burst control measures for excavation and mining of the area the Coalface No. 1 4064, which is located in the 1st mining block of the Mining Plant 1, locality Karvind. It is an area that has been left in place as a protective area for safety reasons due to the high risk of rock bursts, and it is bordered on both sides by old workings. The aim of the proposal is to extract the retained area by using rock burst control measures to reduce this risk. As a measure, extensive disintegration of the rock massif in the overlying rocks of the seam by blasting works was chosen, both in driving mine workings and in mining of the coalface. The article describes the methods and scope of implementation of active and passive rock burst control measures in standard situations and in the case of detection of an unfavourable stress level.
Název v anglickém jazyce
A Proposal of Rock Burst Control Measures at the Coalface No. 1 4064 at the Mining Plant 1, in OKD, A. S. Czech Republic
Popis výsledku anglicky
The paper describes a proposal of rock burst control measures for excavation and mining of the area the Coalface No. 1 4064, which is located in the 1st mining block of the Mining Plant 1, locality Karvind. It is an area that has been left in place as a protective area for safety reasons due to the high risk of rock bursts, and it is bordered on both sides by old workings. The aim of the proposal is to extract the retained area by using rock burst control measures to reduce this risk. As a measure, extensive disintegration of the rock massif in the overlying rocks of the seam by blasting works was chosen, both in driving mine workings and in mining of the coalface. The article describes the methods and scope of implementation of active and passive rock burst control measures in standard situations and in the case of detection of an unfavourable stress level.
Klasifikace
Druh
J<sub>imp</sub> - Článek v periodiku v databázi Web of Science
CEP obor
—
OECD FORD obor
20703 - Mining and mineral processing
Návaznosti výsledku
Projekt
<a href="/cs/project/TE02000029" target="_blank" >TE02000029: Centrum kompetence efektivní a ekologické těžby nerostných surovin</a><br>
Návaznosti
P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)
Ostatní
Rok uplatnění
2020
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název periodika
Inżynieria Mineralna
ISSN
1640-4920
e-ISSN
—
Svazek periodika
45
Číslo periodika v rámci svazku
1
Stát vydavatele periodika
PL - Polská republika
Počet stran výsledku
8
Strana od-do
105-112
Kód UT WoS článku
000552397100016
EID výsledku v databázi Scopus
—