Current Issues of the Rozna I Mine Dewatering due to its Flooding Process, Czech Republic
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F61989100%3A27350%2F21%3A10247002" target="_blank" >RIV/61989100:27350/21:10247002 - isvavai.cz</a>
Výsledek na webu
<a href="https://www.worldresearchlibrary.org/up_proc/pdf/4188-161587314728-34.pdf" target="_blank" >https://www.worldresearchlibrary.org/up_proc/pdf/4188-161587314728-34.pdf</a>
DOI - Digital Object Identifier
—
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Current Issues of the Rozna I Mine Dewatering due to its Flooding Process, Czech Republic
Popis výsledku v původním jazyce
Mine water is pumped by multi-staged pumping system through discharge lines towards the surface, where the water is further decontaminated. Cascade pumping system is fully automated thanks to programmable automatic machines by the company Siemens with subsequent visualization at the central control center at Rozna I. Current state will be changed depending on reconfiguration of the mine due to partial flooding of the mine. Partial flooding will be done from 12th to 24th level. Second part of this paper describes technical and conceptual proposal for a change of the pumping system and a new way of pumping. Reusing of the pumping units, automatic machines and other appliances from the dismantled main pumping stations is considered. Described issues are bound by corresponding legislative of the Czech Republic. To conclude, a situation, which will occur as soon as the mine is fully flooded and the mine complex is completely abandoned, is contemplated.
Název v anglickém jazyce
Current Issues of the Rozna I Mine Dewatering due to its Flooding Process, Czech Republic
Popis výsledku anglicky
Mine water is pumped by multi-staged pumping system through discharge lines towards the surface, where the water is further decontaminated. Cascade pumping system is fully automated thanks to programmable automatic machines by the company Siemens with subsequent visualization at the central control center at Rozna I. Current state will be changed depending on reconfiguration of the mine due to partial flooding of the mine. Partial flooding will be done from 12th to 24th level. Second part of this paper describes technical and conceptual proposal for a change of the pumping system and a new way of pumping. Reusing of the pumping units, automatic machines and other appliances from the dismantled main pumping stations is considered. Described issues are bound by corresponding legislative of the Czech Republic. To conclude, a situation, which will occur as soon as the mine is fully flooded and the mine complex is completely abandoned, is contemplated.
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
—
OECD FORD obor
20703 - Mining and mineral processing
Návaznosti výsledku
Projekt
—
Návaznosti
S - Specificky vyzkum na vysokych skolach
Ostatní
Rok uplatnění
2021
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
Proceedings of Academics World International Conference : 19th - 20th February, 2021, Edinburgh, United Kingdom
ISBN
978-93-90150-33-5
ISSN
—
e-ISSN
—
Počet stran výsledku
7
Strana od-do
28-34
Název nakladatele
Institute for Technology and Research
Místo vydání
Bhuvanéšvar
Místo konání akce
Edinburgh
Datum konání akce
19. 2. 2021
Typ akce podle státní příslušnosti
WRD - Celosvětová akce
Kód UT WoS článku
—