THE EVALUATION OF EFFICIENCY OF THE USE OF MACHINE WORKING TIME IN THE INDUSTRIAL COMPANY - CASE STUDY
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F61989100%3A27360%2F17%3A10236595" target="_blank" >RIV/61989100:27360/17:10236595 - isvavai.cz</a>
Nalezeny alternativní kódy
RIV/61989100:27730/17:10236595
Výsledek na webu
<a href="http://dx.doi.org/10.1515/mspe-2017-0034" target="_blank" >http://dx.doi.org/10.1515/mspe-2017-0034</a>
DOI - Digital Object Identifier
<a href="http://dx.doi.org/10.1515/mspe-2017-0034" target="_blank" >10.1515/mspe-2017-0034</a>
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
THE EVALUATION OF EFFICIENCY OF THE USE OF MACHINE WORKING TIME IN THE INDUSTRIAL COMPANY - CASE STUDY
Popis výsledku v původním jazyce
In the paper the evaluation of efficiency of the use of machines in the selected production company was presented. The OEE method (Overall Equipment Effectiveness) was used for the analysis. The selected company deals with the production of tapered roller bearings. The analysis of effectiveness was done for 17 automatic grinding lines working in the department of grinding rollers. Low level of efficiency of machines was affected by problems with the availability of machines and devices. The causes of machine downtime on these lines was also analyzed. Three basic causes of downtime were identified: no kanban card, diamonding, no operator. Ways to improve the use of these machines were suggested. The analysis takes into account the actual results from the production process and covers the period of one calendar year.
Název v anglickém jazyce
THE EVALUATION OF EFFICIENCY OF THE USE OF MACHINE WORKING TIME IN THE INDUSTRIAL COMPANY - CASE STUDY
Popis výsledku anglicky
In the paper the evaluation of efficiency of the use of machines in the selected production company was presented. The OEE method (Overall Equipment Effectiveness) was used for the analysis. The selected company deals with the production of tapered roller bearings. The analysis of effectiveness was done for 17 automatic grinding lines working in the department of grinding rollers. Low level of efficiency of machines was affected by problems with the availability of machines and devices. The causes of machine downtime on these lines was also analyzed. Three basic causes of downtime were identified: no kanban card, diamonding, no operator. Ways to improve the use of these machines were suggested. The analysis takes into account the actual results from the production process and covers the period of one calendar year.
Klasifikace
Druh
J<sub>imp</sub> - Článek v periodiku v databázi Web of Science
CEP obor
—
OECD FORD obor
21100 - Other engineering and technologies
Návaznosti výsledku
Projekt
Výsledek vznikl pri realizaci vícero projektů. Více informací v záložce Projekty.
Návaznosti
P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)
Ostatní
Rok uplatnění
2017
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název periodika
Management Systems in Production Engineering
ISSN
2299-0461
e-ISSN
—
Svazek periodika
25
Číslo periodika v rámci svazku
4
Stát vydavatele periodika
PL - Polská republika
Počet stran výsledku
5
Strana od-do
241-245
Kód UT WoS článku
000414631000003
EID výsledku v databázi Scopus
—