Concept of Real-Time Communication in Off-Grid System with Vehicle-to-Home Technology
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F61989100%3A27730%2F20%3A10246087" target="_blank" >RIV/61989100:27730/20:10246087 - isvavai.cz</a>
Výsledek na webu
<a href="https://ieeexplore.ieee.org/document/9269236" target="_blank" >https://ieeexplore.ieee.org/document/9269236</a>
DOI - Digital Object Identifier
<a href="http://dx.doi.org/10.1109/EPE51172.2020.9269236" target="_blank" >10.1109/EPE51172.2020.9269236</a>
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Concept of Real-Time Communication in Off-Grid System with Vehicle-to-Home Technology
Popis výsledku v původním jazyce
In this paper are proposed two ways of communication in the Off-Grid system, PowerLine communication (PLC) and wireless. Four concepts are created by combining ordinary or smart appliance and PLC or Wireless communication. Reliable communication is necessary for proper operation of the Off-Grid control system based on demand response. It is important for control system to know what appliances are connected and running and for an appliance is important to know whether it is allowed to start operation. At first, the Off-Grid and its control system is described, then several parameters of the communication network created by PLC in the Off-Grid system are tested and analysed. During testing, different appliances are connected to the Off-Grid to identify their impact on these parameters.
Název v anglickém jazyce
Concept of Real-Time Communication in Off-Grid System with Vehicle-to-Home Technology
Popis výsledku anglicky
In this paper are proposed two ways of communication in the Off-Grid system, PowerLine communication (PLC) and wireless. Four concepts are created by combining ordinary or smart appliance and PLC or Wireless communication. Reliable communication is necessary for proper operation of the Off-Grid control system based on demand response. It is important for control system to know what appliances are connected and running and for an appliance is important to know whether it is allowed to start operation. At first, the Off-Grid and its control system is described, then several parameters of the communication network created by PLC in the Off-Grid system are tested and analysed. During testing, different appliances are connected to the Off-Grid to identify their impact on these parameters.
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
—
OECD FORD obor
20200 - Electrical engineering, Electronic engineering, Information engineering
Návaznosti výsledku
Projekt
Výsledek vznikl pri realizaci vícero projektů. Více informací v záložce Projekty.
Návaznosti
S - Specificky vyzkum na vysokych skolach
Ostatní
Rok uplatnění
2020
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
2020 21st International Scientific Conference on Electric Power Engineering (EPE) : conference proceedings : 19-21 October 2020, Prague, Czech Republic
ISBN
978-1-72819-480-6
ISSN
2376-5623
e-ISSN
2376-5631
Počet stran výsledku
6
Strana od-do
1-6
Název nakladatele
IEEE
Místo vydání
Piscataway
Místo konání akce
Praha
Datum konání akce
19. 10. 2020
Typ akce podle státní příslušnosti
WRD - Celosvětová akce
Kód UT WoS článku
—