Možnosti zaměření trasy lesních cest metodou GPS
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F62156489%3A43410%2F07%3A00111395" target="_blank" >RIV/62156489:43410/07:00111395 - isvavai.cz</a>
Výsledek na webu
—
DOI - Digital Object Identifier
—
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Possibilities of surveying the forest road line using the gps method
Popis výsledku v původním jazyce
At present, the forest road line is surveyed as a tacheometrical belt at the creation of project documentation. In the area of the Křtiny Training Forest Enterprise "Masaryk Forest", possibilities were tested to survey a future line by means of the GPS method. The accuracy of ground surveying will always become evident in the directional and vertical routing and in the road cross sections and, finally, in the determination of the amount of earthmoving works in the measurement report and subsequently, inthe budget price of the forest road construction. The implemented study shows that it is suitable to use the method of GPS in the forest environment rather as an additional method. It can serve, eg for searching for established traverse points and particularly for checking the surveyed route at its measurement by relative coordinates. Using this method it is possible to avoid errors during the measurement of angles and distances. To establish the beginning and end of the road line it is
Název v anglickém jazyce
Possibilities of surveying the forest road line using the gps method
Popis výsledku anglicky
At present, the forest road line is surveyed as a tacheometrical belt at the creation of project documentation. In the area of the Křtiny Training Forest Enterprise "Masaryk Forest", possibilities were tested to survey a future line by means of the GPS method. The accuracy of ground surveying will always become evident in the directional and vertical routing and in the road cross sections and, finally, in the determination of the amount of earthmoving works in the measurement report and subsequently, inthe budget price of the forest road construction. The implemented study shows that it is suitable to use the method of GPS in the forest environment rather as an additional method. It can serve, eg for searching for established traverse points and particularly for checking the surveyed route at its measurement by relative coordinates. Using this method it is possible to avoid errors during the measurement of angles and distances. To establish the beginning and end of the road line it is
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
GK - Lesnictví
OECD FORD obor
—
Návaznosti výsledku
Projekt
—
Návaznosti
Z - Vyzkumny zamer (s odkazem do CEZ)
Ostatní
Rok uplatnění
2007
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
Landscape Management - Present and Future
ISBN
978-80-7375-084-8
ISSN
—
e-ISSN
—
Počet stran výsledku
1
Strana od-do
10-10
Název nakladatele
MZLU
Místo vydání
Brno
Místo konání akce
Křtiny
Datum konání akce
12. 9. 2007
Typ akce podle státní příslušnosti
EUR - Evropská akce
Kód UT WoS článku
—