Toky arzenu v systému půda-voda na zlatonosném revíru Čelina-Mokrsko, Český masív
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F67985831%3A_____%2F05%3A00028604" target="_blank" >RIV/67985831:_____/05:00028604 - isvavai.cz</a>
Výsledek na webu
—
DOI - Digital Object Identifier
—
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Fluxes of Arsenic in Soil-Water System at the Čelina-Mokrsko Gold District, Bohemian Massif
Popis výsledku v původním jazyce
We present a weathering mass balance of two small catchments, located within the Čelina-Mokrsko gold district (Central Bohemia) that has never been mined and, which is affected by serious As contamination as a consequence of arsenopyrite weathering. Mechanical and chemical weathering rates of rocks were estimated at 656 kg/ha/year and 172 kg/ha/year at the Mokrsko catchment and 329 kg/ha/year and 45 kg/ha/year at the Čelina catchment, respectively. The weathering rate of arsenopyrite was estimated at 1210 g/ha/year and 210 g/ha/year during the period of 2003-2004 in the highly As mineralized Mokrsko catchment and less As-mineralized Čelina catchment, respectively. Mass budgets of arsenic in soil of both catchments reveal that As has been accumulated in the soil of the Čelina catchment and depleted in the soil of the Mokrsko catchment during the sampling interval.
Název v anglickém jazyce
Fluxes of Arsenic in Soil-Water System at the Čelina-Mokrsko Gold District, Bohemian Massif
Popis výsledku anglicky
We present a weathering mass balance of two small catchments, located within the Čelina-Mokrsko gold district (Central Bohemia) that has never been mined and, which is affected by serious As contamination as a consequence of arsenopyrite weathering. Mechanical and chemical weathering rates of rocks were estimated at 656 kg/ha/year and 172 kg/ha/year at the Mokrsko catchment and 329 kg/ha/year and 45 kg/ha/year at the Čelina catchment, respectively. The weathering rate of arsenopyrite was estimated at 1210 g/ha/year and 210 g/ha/year during the period of 2003-2004 in the highly As mineralized Mokrsko catchment and less As-mineralized Čelina catchment, respectively. Mass budgets of arsenic in soil of both catchments reveal that As has been accumulated in the soil of the Čelina catchment and depleted in the soil of the Mokrsko catchment during the sampling interval.
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
DD - Geochemie
OECD FORD obor
—
Návaznosti výsledku
Projekt
—
Návaznosti
Z - Vyzkumny zamer (s odkazem do CEZ)
Ostatní
Rok uplatnění
2005
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
Mineral Deposit Research: Meeting the Global Challenge : Proceedings of the Eighth Biennial SGA Meeting, Beijing, China, 18 - 21 August 2005
ISBN
3-540-27945-8
ISSN
—
e-ISSN
—
Počet stran výsledku
4
Strana od-do
927-930
Název nakladatele
Springer
Místo vydání
Berlin
Místo konání akce
Beijing
Datum konání akce
18. 8. 2005
Typ akce podle státní příslušnosti
WRD - Celosvětová akce
Kód UT WoS článku
—