Popis výsledku v původním jazyce
The purpose of the Senotín pilot project (1993?2000) was to determine methods of revitalisation of a sub-mountain headwater area (0.38 km2) in the Novobystřická Vysočina Highlands (610?725 m a. s. l.). Seven underground clay shields stopped pipe drainage, and four balks prevented surface and subsurface runoff. These adaptations improved the water retention capacity of the whole catchment, as demonstrated by the formation of runoff in the revitalised area. A typical rainstorm (amount 15 mm, duration 5.6hours, max. intensity 1.8 mm/20 minutes) and consequent runoff was analysed, along with the role of soil in runoff retardation and water retention. The time course of the contributing area was also quantified. The contributing area was formed in the surface soil layer with a thickness of about 40 cm. Runoff retardation lasted two hours after the rain began. Retention reached 98% of the total rainfall. Runoff lasted for 85 hours.
Název v anglickém jazyce
Revitalisation of the Senotín catchment
Popis výsledku anglicky
The purpose of the Senotín pilot project (1993?2000) was to determine methods of revitalisation of a sub-mountain headwater area (0.38 km2) in the Novobystřická Vysočina Highlands (610?725 m a. s. l.). Seven underground clay shields stopped pipe drainage, and four balks prevented surface and subsurface runoff. These adaptations improved the water retention capacity of the whole catchment, as demonstrated by the formation of runoff in the revitalised area. A typical rainstorm (amount 15 mm, duration 5.6hours, max. intensity 1.8 mm/20 minutes) and consequent runoff was analysed, along with the role of soil in runoff retardation and water retention. The time course of the contributing area was also quantified. The contributing area was formed in the surface soil layer with a thickness of about 40 cm. Runoff retardation lasted two hours after the rain began. Retention reached 98% of the total rainfall. Runoff lasted for 85 hours.
Klasifikace
Druh
J<sub>x</sub> - Nezařazeno - Článek v odborném periodiku (Jimp, Jsc a Jost)
CEP obor
DA - Hydrologie a limnologie
OECD FORD obor
—
Návaznosti výsledku
Projekt
Výsledek vznikl pri realizaci vícero projektů. Více informací v záložce Projekty.
Návaznosti
P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)<br>Z - Vyzkumny zamer (s odkazem do CEZ)
Ostatní
Rok uplatnění
2008
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název periodika
Littera Scripta
ISSN
1802-503X
e-ISSN
—
Svazek periodika
1
Číslo periodika v rámci svazku
1
Stát vydavatele periodika
CZ - Česká republika
Počet stran výsledku
11
Strana od-do
—
Kód UT WoS článku
—
EID výsledku v databázi Scopus
—