Seismological Activity During Room and Pillar Hard Coal Extraction at Great Depth
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68145535%3A_____%2F17%3A00475754" target="_blank" >RIV/68145535:_____/17:00475754 - isvavai.cz</a>
Výsledek na webu
<a href="http://www.sciencedirect.com/science/article/pii/S1877705817322956" target="_blank" >http://www.sciencedirect.com/science/article/pii/S1877705817322956</a>
DOI - Digital Object Identifier
<a href="http://dx.doi.org/10.1016/j.proeng.2017.05.155" target="_blank" >10.1016/j.proeng.2017.05.155</a>
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Seismological Activity During Room and Pillar Hard Coal Extraction at Great Depth
Popis výsledku v původním jazyce
A first attempt of using the Room and Pillar mining method in the Czech Republic was implemented in the southern part of the Upper Silesian Coal Basin. This stratigraphical unit is well known for its complex geological structure with more than 40 main coal seams vertically distributed in the area of about 122 km2 of active mines and a complex slide/overlap fault system. The fact that the extraction of coal by this method is realised at a depth around 900 m below the surface has also made it one of the deepest Room and Pillar mining sites in the world. These facts brought lead to several questions. The main question connected to sustaining the safety of the workers before and after the advance of the mining works has resulted in this study of the prediction of unnatural seismological activity based on data that were collected during and after the excavation of the coal seam. Also, we ask whether the methods can be used for the prediction of inhomogeneous stress distributions in this kind of openings. Seismological monitoring, which is the main goal of this paper, was supplemented by stress and deformation measurements in coal pillars and surrounding rocks. More stations were added to the network of seismic stations of the coal mine at different levels surrounding the Room and Pillar site. We give the first results of the evaluation of seismic activity during the driving of the roadway in the first mining panel. We describe the site and mining conditions, details about seismological network, and a comparison of seismic activity with the gate driving advance and creation of coal pillars. This is compared to stress changes in the coal pillars.
Název v anglickém jazyce
Seismological Activity During Room and Pillar Hard Coal Extraction at Great Depth
Popis výsledku anglicky
A first attempt of using the Room and Pillar mining method in the Czech Republic was implemented in the southern part of the Upper Silesian Coal Basin. This stratigraphical unit is well known for its complex geological structure with more than 40 main coal seams vertically distributed in the area of about 122 km2 of active mines and a complex slide/overlap fault system. The fact that the extraction of coal by this method is realised at a depth around 900 m below the surface has also made it one of the deepest Room and Pillar mining sites in the world. These facts brought lead to several questions. The main question connected to sustaining the safety of the workers before and after the advance of the mining works has resulted in this study of the prediction of unnatural seismological activity based on data that were collected during and after the excavation of the coal seam. Also, we ask whether the methods can be used for the prediction of inhomogeneous stress distributions in this kind of openings. Seismological monitoring, which is the main goal of this paper, was supplemented by stress and deformation measurements in coal pillars and surrounding rocks. More stations were added to the network of seismic stations of the coal mine at different levels surrounding the Room and Pillar site. We give the first results of the evaluation of seismic activity during the driving of the roadway in the first mining panel. We describe the site and mining conditions, details about seismological network, and a comparison of seismic activity with the gate driving advance and creation of coal pillars. This is compared to stress changes in the coal pillars.
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
—
OECD FORD obor
20703 - Mining and mineral processing
Návaznosti výsledku
Projekt
Výsledek vznikl pri realizaci vícero projektů. Více informací v záložce Projekty.
Návaznosti
I - Institucionalni podpora na dlouhodoby koncepcni rozvoj vyzkumne organizace
Ostatní
Rok uplatnění
2017
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
Procedia Engineering - ISRM European Rock Mechanics Symposium EUROCK 2017
ISBN
—
ISSN
1877-7058
e-ISSN
—
Počet stran výsledku
7
Strana od-do
67-73
Název nakladatele
Elsevier Ltd.
Místo vydání
Amsterdam
Místo konání akce
Ostrava
Datum konání akce
20. 6. 2017
Typ akce podle státní příslušnosti
WRD - Celosvětová akce
Kód UT WoS článku
000416996000009