Experimentální výzkum spolehlivosti těsnění kabelových prostupů v Pražském metru po povodních v létě 2002
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68378297%3A_____%2F04%3A00106143" target="_blank" >RIV/68378297:_____/04:00106143 - isvavai.cz</a>
Nalezeny alternativní kódy
RIV/68407700:21260/04:06102974
Výsledek na webu
—
DOI - Digital Object Identifier
—
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Experimental research of reliability of cable bushings in Prague metro after floods in summer 2002
Popis výsledku v původním jazyce
Confluence of the rivers Berounka and Sázava and outflows from the Vltava dam cascade caused the flow in the lower part of the river Vltava in Prague. The Vltava culminated in Prague on 14 August with a flow of 5160 m3.s-1; this corresponds to a period of recurrence of 500 years. The extension of floods in the Vltava valley in Prague caused penetration of water into underground spaces of the Metro and water flooded 19 of 53 underground stations. Looseness of cable bushings through pressure interfaces and non-closure of some pressure interfaces were the most important cause of spreading of water in underground spaces. After the floods of August 2002 the accredited laboratory CTU in Prague, Klokner Institute designed a methodology of experiments and testing system and performed tests on reliability of cable bushings and on material properties of the U 5000. Results of experiments lead to the recommendation to replace all the existing cable bushing in Prague Metro
Název v anglickém jazyce
Experimental research of reliability of cable bushings in Prague metro after floods in summer 2002
Popis výsledku anglicky
Confluence of the rivers Berounka and Sázava and outflows from the Vltava dam cascade caused the flow in the lower part of the river Vltava in Prague. The Vltava culminated in Prague on 14 August with a flow of 5160 m3.s-1; this corresponds to a period of recurrence of 500 years. The extension of floods in the Vltava valley in Prague caused penetration of water into underground spaces of the Metro and water flooded 19 of 53 underground stations. Looseness of cable bushings through pressure interfaces and non-closure of some pressure interfaces were the most important cause of spreading of water in underground spaces. After the floods of August 2002 the accredited laboratory CTU in Prague, Klokner Institute designed a methodology of experiments and testing system and performed tests on reliability of cable bushings and on material properties of the U 5000. Results of experiments lead to the recommendation to replace all the existing cable bushing in Prague Metro
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
JN - Stavebnictví
OECD FORD obor
—
Návaznosti výsledku
Projekt
—
Návaznosti
Z - Vyzkumny zamer (s odkazem do CEZ)
Ostatní
Rok uplatnění
2004
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
Experimental methods and measurement techniques in monitoring and supervising engineering structures and their numerical analysis
ISBN
80-86246-20-5
ISSN
—
e-ISSN
—
Počet stran výsledku
4
Strana od-do
86
Název nakladatele
Faculty of Transportation Sciences CTU in Prague
Místo vydání
Praha
Místo konání akce
Tábor
Datum konání akce
17. 6. 2004
Typ akce podle státní příslušnosti
EUR - Evropská akce
Kód UT WoS článku
—