Experiment E7/0,3-displacement processes in non cohesive sand mass during active translative motion of retaining wall
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68378297%3A_____%2F16%3A00461639" target="_blank" >RIV/68378297:_____/16:00461639 - isvavai.cz</a>
Výsledek na webu
—
DOI - Digital Object Identifier
—
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Experiment E7/0,3-displacement processes in non cohesive sand mass during active translative motion of retaining wall
Popis výsledku v původním jazyce
The first part of information on the new experiment denominated as E7/0,3 with active pressure of non-cohesive quartz sand on time behaviour of the mass was presented at the last Conference (P. Koudelka, 2015). The second part is object of this Paper. The experiment was performed at the Institute of Theoretical and Applied Mechanics in 2014. The moved rigid front wall of the experimental equipment was translatively moved towards active direction (out of the mass) at a position of supposed acting of active pressure value, then the wall motion was stopped and time pressure stability was monitored. After more than three months the wall was moved at the last position of 100 mm from original position before the experiment. The experiment ran four and a half months. The paper presents firstly results on the deforming mass through the course of the wall movement at a supposed position for active pressure mobilization of 1.357 mm and after the further movement. The experiment was repeated to be the results proved (Experiment E8/0,3). New results are analysed.
Název v anglickém jazyce
Experiment E7/0,3-displacement processes in non cohesive sand mass during active translative motion of retaining wall
Popis výsledku anglicky
The first part of information on the new experiment denominated as E7/0,3 with active pressure of non-cohesive quartz sand on time behaviour of the mass was presented at the last Conference (P. Koudelka, 2015). The second part is object of this Paper. The experiment was performed at the Institute of Theoretical and Applied Mechanics in 2014. The moved rigid front wall of the experimental equipment was translatively moved towards active direction (out of the mass) at a position of supposed acting of active pressure value, then the wall motion was stopped and time pressure stability was monitored. After more than three months the wall was moved at the last position of 100 mm from original position before the experiment. The experiment ran four and a half months. The paper presents firstly results on the deforming mass through the course of the wall movement at a supposed position for active pressure mobilization of 1.357 mm and after the further movement. The experiment was repeated to be the results proved (Experiment E8/0,3). New results are analysed.
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
JM - Inženýrské stavitelství
OECD FORD obor
—
Návaznosti výsledku
Projekt
—
Návaznosti
I - Institucionalni podpora na dlouhodoby koncepcni rozvoj vyzkumne organizace
Ostatní
Rok uplatnění
2016
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
Engineering Mechanics 2016
ISBN
978-80-87012-59-8
ISSN
1805-8248
e-ISSN
—
Počet stran výsledku
4
Strana od-do
306-309
Název nakladatele
Institute of Thermomechanics CAS, v. v. i.
Místo vydání
Prague
Místo konání akce
Svratka
Datum konání akce
9. 5. 2016
Typ akce podle státní příslušnosti
EUR - Evropská akce
Kód UT WoS článku
000379986700073