Risk Management of Tunnel Projects
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21110%2F10%3A00166190" target="_blank" >RIV/68407700:21110/10:00166190 - isvavai.cz</a>
Výsledek na webu
—
DOI - Digital Object Identifier
—
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Risk Management of Tunnel Projects
Popis výsledku v původním jazyce
Tunnels are one of the most costly and complicated part of transport infrastructure. Their construction is connected with high uncertainty in the field of costs, schedule, safety and impact on surroundings. In the Czech Republic, a boom in transport infrastructure development during last 15 years has led to frequent construction of tunnels. However, risks have not been managed properly in these projects. Risks have not been considered during the preparation of the projects, operative decisions have notbeen carried out based on risk analysis. In addition, the insurers of large tunnel projects have not had appropriate data for setting the insurance premium. Therefore, this work suggests a framework for a systematic process for risk management and it provides tools for analysis of risk connected with excavation in uncertain geotechnical conditions (including collection of historical data).
Název v anglickém jazyce
Risk Management of Tunnel Projects
Popis výsledku anglicky
Tunnels are one of the most costly and complicated part of transport infrastructure. Their construction is connected with high uncertainty in the field of costs, schedule, safety and impact on surroundings. In the Czech Republic, a boom in transport infrastructure development during last 15 years has led to frequent construction of tunnels. However, risks have not been managed properly in these projects. Risks have not been considered during the preparation of the projects, operative decisions have notbeen carried out based on risk analysis. In addition, the insurers of large tunnel projects have not had appropriate data for setting the insurance premium. Therefore, this work suggests a framework for a systematic process for risk management and it provides tools for analysis of risk connected with excavation in uncertain geotechnical conditions (including collection of historical data).
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
JN - Stavebnictví
OECD FORD obor
—
Návaznosti výsledku
Projekt
—
Návaznosti
V - Vyzkumna aktivita podporovana z jinych verejnych zdroju
Ostatní
Rok uplatnění
2010
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
Workshop 2010
ISBN
978-80-01-04513-8
ISSN
—
e-ISSN
—
Počet stran výsledku
2
Strana od-do
—
Název nakladatele
České vysoké učení technické v Praze
Místo vydání
Praha
Místo konání akce
Praha
Datum konání akce
22. 2. 2010
Typ akce podle státní příslušnosti
EUR - Evropská akce
Kód UT WoS článku
—