The Use of Classic Convergence Measurement during the Assembly of TOM-2CU-and-Cover Constructions
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21110%2F10%3A00190127" target="_blank" >RIV/68407700:21110/10:00190127 - isvavai.cz</a>
Výsledek na webu
—
DOI - Digital Object Identifier
—
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
The Use of Classic Convergence Measurement during the Assembly of TOM-2CU-and-Cover Constructions
Popis výsledku v původním jazyce
ABSTRACT: The last few years have seen rapid progress in the design of prefabricated cut-and-cover constructions commonly referred to as TOM2s. Unlike the older TOM1 range where prefabricated members were monolithised in butt joints, the number of monolithised joints in the newer TOM2 range has been minimised. TOMs are considered to be bridge constructions, although in terms of their shape they rather resemble cut-and-cover tunnels. The first TOM2 type structure to be constructed was a bridge spanning the Vejprnický Stream built in 1996 on the rerouted II/180 Zbůch - Nýřany road. Since this bridge was the first construction of its type it was subjected to a series of exhaustive measurements and tests both during construction and following completion. From the very beginning, a simple method for the dependable monitoring of, particularly, the time taken to cover the construction was sought since the failure to accurately observe the prescribed covering technology, could have resulted in
Název v anglickém jazyce
The Use of Classic Convergence Measurement during the Assembly of TOM-2CU-and-Cover Constructions
Popis výsledku anglicky
ABSTRACT: The last few years have seen rapid progress in the design of prefabricated cut-and-cover constructions commonly referred to as TOM2s. Unlike the older TOM1 range where prefabricated members were monolithised in butt joints, the number of monolithised joints in the newer TOM2 range has been minimised. TOMs are considered to be bridge constructions, although in terms of their shape they rather resemble cut-and-cover tunnels. The first TOM2 type structure to be constructed was a bridge spanning the Vejprnický Stream built in 1996 on the rerouted II/180 Zbůch - Nýřany road. Since this bridge was the first construction of its type it was subjected to a series of exhaustive measurements and tests both during construction and following completion. From the very beginning, a simple method for the dependable monitoring of, particularly, the time taken to cover the construction was sought since the failure to accurately observe the prescribed covering technology, could have resulted in
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
JM - Inženýrské stavitelství
OECD FORD obor
—
Návaznosti výsledku
Projekt
<a href="/cs/project/GA103%2F08%2F1691" target="_blank" >GA103/08/1691: Dlouhodobé sledování tunelových ostění</a><br>
Návaznosti
P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)
Ostatní
Rok uplatnění
2010
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
11th International Conference Underground Construction Prague 2010 Transport and City Tunnels
ISBN
978-80-254-7054-1
ISSN
—
e-ISSN
—
Počet stran výsledku
7
Strana od-do
660-666
Název nakladatele
Český tunelářský komitét ITA
Místo vydání
Praha
Místo konání akce
Praha
Datum konání akce
14. 6. 2010
Typ akce podle státní příslušnosti
EUR - Evropská akce