The longest Czech bridge on the Prague Ring Road, section Lahovice-Radotín
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21110%2F12%3A00199932" target="_blank" >RIV/68407700:21110/12:00199932 - isvavai.cz</a>
Výsledek na webu
—
DOI - Digital Object Identifier
—
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
The longest Czech bridge on the Prague Ring Road, section Lahovice-Radotín
Popis výsledku v původním jazyce
The bridge across the Berounka river valley forms a part of the new south-western part of Prague's by-pass and with its total length of more than two kilometers is one of the largest infrastructure projects in the Czech Republic and has a great importance in calming of the traffic congestion in the capital. Three different construction methods took a part in the building of the bridge - fixed scaffolding, the overhead movable scaffold system and the balanced cantilever method using of up to four pairs of form travelers respectively, with the longest span of 114m. The main contractor was B?egl and Krysl. The bridge was designed by Novak & Partner consulting company as a continuous girder with the box section of a variable height of 2.6 to 6m. Over 1500tons of a post-tensioning steel (PT) were installed during the course of construction in years 2008-2009. The PT contractor, VSL Systems has submitted a modified alternative of the PT in order to achieve the material savings and overall s
Název v anglickém jazyce
The longest Czech bridge on the Prague Ring Road, section Lahovice-Radotín
Popis výsledku anglicky
The bridge across the Berounka river valley forms a part of the new south-western part of Prague's by-pass and with its total length of more than two kilometers is one of the largest infrastructure projects in the Czech Republic and has a great importance in calming of the traffic congestion in the capital. Three different construction methods took a part in the building of the bridge - fixed scaffolding, the overhead movable scaffold system and the balanced cantilever method using of up to four pairs of form travelers respectively, with the longest span of 114m. The main contractor was B?egl and Krysl. The bridge was designed by Novak & Partner consulting company as a continuous girder with the box section of a variable height of 2.6 to 6m. Over 1500tons of a post-tensioning steel (PT) were installed during the course of construction in years 2008-2009. The PT contractor, VSL Systems has submitted a modified alternative of the PT in order to achieve the material savings and overall s
Klasifikace
Druh
C - Kapitola v odborné knize
CEP obor
JM - Inženýrské stavitelství
OECD FORD obor
—
Návaznosti výsledku
Projekt
<a href="/cs/project/GAP104%2F11%2F1301" target="_blank" >GAP104/11/1301: Účinky dotvarování a smršťování v singulárních oblastech betonových prvků</a><br>
Návaznosti
P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)
Ostatní
Rok uplatnění
2012
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název knihy nebo sborníku
Engineering Structures V4
ISBN
978-80-87438-29-9
Počet stran výsledku
8
Strana od-do
46-53
Počet stran knihy
266
Název nakladatele
Česká komora autorizovaných inženýrů a techniků činných ve výstavbě
Místo vydání
Praha
Kód UT WoS kapitoly
—