Network arch bridges at Trinec- Baliny, Czech Republic
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21110%2F13%3A00227885" target="_blank" >RIV/68407700:21110/13:00227885 - isvavai.cz</a>
Výsledek na webu
<a href="http://dx.doi.org/10.1680/bren.11.00009" target="_blank" >http://dx.doi.org/10.1680/bren.11.00009</a>
DOI - Digital Object Identifier
<a href="http://dx.doi.org/10.1680/bren.11.00009" target="_blank" >10.1680/bren.11.00009</a>
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Network arch bridges at Trinec- Baliny, Czech Republic
Popis výsledku v původním jazyce
The paper describes the network arches built at the grade separated junction of the II/468 road and the industrial area of Trinec-Baliny in the Czech Republic. A network arch is defined as an arch bridge with inclined hangers where some hangers cross other hangers at least twice. The tie is formed by a concrete slab with longitudinal prestress. Owing to the arrangement of hangers, there is little bending in the tie and the arches. All hangers have the same cross-section. Their connections should be placed equidistantly along the arch; the hangers act like a light web. The two 73?5 m span network arch bridges described in the paper and the adjacent approach ramps work as one articulation system. The paper presents the prestressing arrangement of the prestressed concrete deck, the unique bridge articulation without fixed bearing and the prestressing of the interchange between the arch bridges (the part where the approach ramps turn left and right from the longitudinal axis of the bridges
Název v anglickém jazyce
Network arch bridges at Trinec- Baliny, Czech Republic
Popis výsledku anglicky
The paper describes the network arches built at the grade separated junction of the II/468 road and the industrial area of Trinec-Baliny in the Czech Republic. A network arch is defined as an arch bridge with inclined hangers where some hangers cross other hangers at least twice. The tie is formed by a concrete slab with longitudinal prestress. Owing to the arrangement of hangers, there is little bending in the tie and the arches. All hangers have the same cross-section. Their connections should be placed equidistantly along the arch; the hangers act like a light web. The two 73?5 m span network arch bridges described in the paper and the adjacent approach ramps work as one articulation system. The paper presents the prestressing arrangement of the prestressed concrete deck, the unique bridge articulation without fixed bearing and the prestressing of the interchange between the arch bridges (the part where the approach ramps turn left and right from the longitudinal axis of the bridges
Klasifikace
Druh
J<sub>x</sub> - Nezařazeno - Článek v odborném periodiku (Jimp, Jsc a Jost)
CEP obor
JM - Inženýrské stavitelství
OECD FORD obor
—
Návaznosti výsledku
Projekt
—
Návaznosti
Z - Vyzkumny zamer (s odkazem do CEZ)
Ostatní
Rok uplatnění
2013
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název periodika
Proceedings of the Institute of Civil Engineers: Bridge Engineering
ISSN
1478-4637
e-ISSN
—
Svazek periodika
160
Číslo periodika v rámci svazku
2
Stát vydavatele periodika
GB - Spojené království Velké Británie a Severního Irska
Počet stran výsledku
9
Strana od-do
177-185
Kód UT WoS článku
—
EID výsledku v databázi Scopus
—