On Inverse Formulation of Reliability-Based Design Optimizaton
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21110%2F14%3A00221943" target="_blank" >RIV/68407700:21110/14:00221943 - isvavai.cz</a>
Výsledek na webu
<a href="http://mech.fsv.cvut.cz/nmm/proceedings-of-nano-macro-mechanics-2014.pdf" target="_blank" >http://mech.fsv.cvut.cz/nmm/proceedings-of-nano-macro-mechanics-2014.pdf</a>
DOI - Digital Object Identifier
—
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
On Inverse Formulation of Reliability-Based Design Optimizaton
Popis výsledku v původním jazyce
A multi-objective Reliability-based design optimization (RBDO) deals with a search for a set of trade-off solutions with a minimum costs and the maximum reliability of the structure. A performance measure, as a difference between the value of the limit state function and the zero level, is constant in the classical RBDO formulation. From a different point of view, some tasks require a fixed reliability but searching for the compromising solutions for the minimization of costs and maximization of the performance measure to find the most advantageous solutions. This task is called an inverse Reliability-based design optimization (iRBDO) and is formulated in a multi-objective sense in this contribution. To evaluate the performance measure, an inverse Monte Carlo is employed.
Název v anglickém jazyce
On Inverse Formulation of Reliability-Based Design Optimizaton
Popis výsledku anglicky
A multi-objective Reliability-based design optimization (RBDO) deals with a search for a set of trade-off solutions with a minimum costs and the maximum reliability of the structure. A performance measure, as a difference between the value of the limit state function and the zero level, is constant in the classical RBDO formulation. From a different point of view, some tasks require a fixed reliability but searching for the compromising solutions for the minimization of costs and maximization of the performance measure to find the most advantageous solutions. This task is called an inverse Reliability-based design optimization (iRBDO) and is formulated in a multi-objective sense in this contribution. To evaluate the performance measure, an inverse Monte Carlo is employed.
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
JD - Využití počítačů, robotika a její aplikace
OECD FORD obor
—
Návaznosti výsledku
Projekt
<a href="/cs/project/GAP105%2F12%2F1146" target="_blank" >GAP105/12/1146: Metody paralelizace inženýrských úloh využívající cenově dostupné technologie</a><br>
Návaznosti
P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)
Ostatní
Rok uplatnění
2014
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
Proceedings of the 5th Conference Nano & Macro Mechanics
ISBN
978-80-01-05570-0
ISSN
—
e-ISSN
—
Počet stran výsledku
8
Strana od-do
121-128
Název nakladatele
Czech Technical University
Místo vydání
Prague
Místo konání akce
Praha
Datum konání akce
18. 9. 2014
Typ akce podle státní příslušnosti
CST - Celostátní akce
Kód UT WoS článku
—