Potential of Using Design-Build in Public Procurement
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21110%2F16%3A00300552" target="_blank" >RIV/68407700:21110/16:00300552 - isvavai.cz</a>
Výsledek na webu
<a href="http://redfame.com/journal/index.php/afa/article/view/1708/1763" target="_blank" >http://redfame.com/journal/index.php/afa/article/view/1708/1763</a>
DOI - Digital Object Identifier
<a href="http://dx.doi.org/10.11114/afa.v2i2.1708" target="_blank" >10.11114/afa.v2i2.1708</a>
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Potential of Using Design-Build in Public Procurement
Popis výsledku v původním jazyce
Risk is an omnipresent effect in every area of human activity. Ignoring it can cause serious problems. This article is about eliminating risk in public contracts using the design-build method as a possible solution to reduce risk. First, we need to compare the standard method of design-bid-build with its alternative, design-build. Two methods are used in this article to analyse risk – the main method is RIPRAN. The evaluated results provided by the RIPRAN method are processed by research data using a scoring method with a risk map. The analysis is going to detect the difference between the DBB and DB methods, primarily in appearance and its impact on the realization of the whole construction. The comparison identifies numerous contractual topics and risks included in both and gives deeper insight into risk management, both for the contracting party and also for public procurement. Applying risk analysis strategies and tools to the process will help decision-makers evaluate and select the most suitable delivery method consistently and defensibly. This paper gives generic risk factors related to both project types.
Název v anglickém jazyce
Potential of Using Design-Build in Public Procurement
Popis výsledku anglicky
Risk is an omnipresent effect in every area of human activity. Ignoring it can cause serious problems. This article is about eliminating risk in public contracts using the design-build method as a possible solution to reduce risk. First, we need to compare the standard method of design-bid-build with its alternative, design-build. Two methods are used in this article to analyse risk – the main method is RIPRAN. The evaluated results provided by the RIPRAN method are processed by research data using a scoring method with a risk map. The analysis is going to detect the difference between the DBB and DB methods, primarily in appearance and its impact on the realization of the whole construction. The comparison identifies numerous contractual topics and risks included in both and gives deeper insight into risk management, both for the contracting party and also for public procurement. Applying risk analysis strategies and tools to the process will help decision-makers evaluate and select the most suitable delivery method consistently and defensibly. This paper gives generic risk factors related to both project types.
Klasifikace
Druh
J<sub>x</sub> - Nezařazeno - Článek v odborném periodiku (Jimp, Jsc a Jost)
CEP obor
JN - Stavebnictví
OECD FORD obor
—
Návaznosti výsledku
Projekt
—
Návaznosti
I - Institucionalni podpora na dlouhodoby koncepcni rozvoj vyzkumne organizace
Ostatní
Rok uplatnění
2016
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název periodika
Applied Finance and Accounting
ISSN
2374-2410
e-ISSN
—
Svazek periodika
2
Číslo periodika v rámci svazku
2
Stát vydavatele periodika
US - Spojené státy americké
Počet stran výsledku
9
Strana od-do
77-85
Kód UT WoS článku
—
EID výsledku v databázi Scopus
—