Life cycle costing of large-scale bridges used during the tender process subjected by design and build contracts
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21110%2F16%3A00301447" target="_blank" >RIV/68407700:21110/16:00301447 - isvavai.cz</a>
Výsledek na webu
—
DOI - Digital Object Identifier
—
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Life cycle costing of large-scale bridges used during the tender process subjected by design and build contracts
Popis výsledku v původním jazyce
The main aim of this paper is to present a method that includes for operational cost considerations within the tendering process of projects, under the Design and Build procurement route, and by doing so to assist in selecting the most effective bid / option. This paper presents the method, which incorporates pre-defined requirements for the calculation of the Life Cycle Cost (LCC), and offers pre-determined weighting criteria for evaluating the proposed solutions of bridges and estimating the overall value of each bid. The method uses a web-based tool and enables the bidders to clearly estimate the overall LCC for their bid preparation. In turn the tender committee has in its hands the same tool that allows them to verify independently all results. In our view, the main goal of any like tender should not be rewarding the lowest cost bid, which is most likely to generate -long term -The higher operational costs, but to effectively assess and account for all factors affecting the Life Cycle of an asset in order to enhance its overall economic effect.
Název v anglickém jazyce
Life cycle costing of large-scale bridges used during the tender process subjected by design and build contracts
Popis výsledku anglicky
The main aim of this paper is to present a method that includes for operational cost considerations within the tendering process of projects, under the Design and Build procurement route, and by doing so to assist in selecting the most effective bid / option. This paper presents the method, which incorporates pre-defined requirements for the calculation of the Life Cycle Cost (LCC), and offers pre-determined weighting criteria for evaluating the proposed solutions of bridges and estimating the overall value of each bid. The method uses a web-based tool and enables the bidders to clearly estimate the overall LCC for their bid preparation. In turn the tender committee has in its hands the same tool that allows them to verify independently all results. In our view, the main goal of any like tender should not be rewarding the lowest cost bid, which is most likely to generate -long term -The higher operational costs, but to effectively assess and account for all factors affecting the Life Cycle of an asset in order to enhance its overall economic effect.
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
JM - Inženýrské stavitelství
OECD FORD obor
—
Návaznosti výsledku
Projekt
—
Návaznosti
S - Specificky vyzkum na vysokych skolach
Ostatní
Rok uplatnění
2016
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
Central Europe towards Sustainable Building 2016 - Innovations for Sustainable Future
ISBN
978-80-271-0248-8
ISSN
—
e-ISSN
—
Počet stran výsledku
6
Strana od-do
1418-1423
Název nakladatele
GRADA PUBLISHING
Místo vydání
Praha
Místo konání akce
Prague
Datum konání akce
22. 6. 2016
Typ akce podle státní příslušnosti
WRD - Celosvětová akce
Kód UT WoS článku
—